My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_1987-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 1:41:06 PM
Creation date
6/23/2020 6:53:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2001
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_1987-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(e) follow all operating procedures specified by ARCO; <br />(f) immediately report to ARCO all suspected or confirmed releases from the tanks and <br />connected piping system, unusual operating conditions, release detection signals and environmental <br />conditions suggesting a release may have occurred, and any spills and overfills that are not contained <br />and cleaned up; <br />(g) properly close the underground tanks as required by law; and, <br />(h) comply with all federal, state and local legal requirements relevant to the operations <br />of the underground tanks and all amendments to any permit to operate. <br />4. With respect to the operation of the underground storage tank system and monitoring equipment, <br />Franchisee hereby acknowledges and agrees: <br />- that ARCO has provided Franchisee with training on each of the items described in the attached <br />Monitoring and Response Plan, <br />- that Franchisee understood the content of the training, and asked any questions necessary to <br />facilitate his understanding, <br />- that Franchisee indicated to ARCO at the time of training any subjects addressed by the <br />training which Franchsee did not fully understand, and <br />- that Franchisee received complete training and information necessary for Franchisee to fully <br />understand the subject of operating underground storage tanks. <br />5. ARCO has provided Franchisee a copy of and Franchisee agrees to maintain on the Premises the <br />Certificate of Financial Responsibility (as required by the United States Environmental Protection <br />Agency in Subpart H, 40 CFR, Part 280 and California Health and Safety Code, Chapter 6.7, <br />Section 25292.2). <br />6. Except to the extent they conflict with, or are less rigorous than the terms of this Amendment, <br />all of the terms and conditions of the PMPA Agreement, as previously or hereafter amended or <br />supplemented, remain in full force. <br />IN WITNESS WHEREOF, ARCO and Franchisee have executed this Amendment. <br />WITNESS: <br />ARCO Products Company <br />a division of Atlantic Richfield Company <br />ARCO <br />By: <br />Manager <br />WITNESS EDWARD A ISAACSON <br />Franchisee's Name <br />By: ri�l�r� a- <br />EDWARD A ISAACSON <br />DATE: <br />CA <br />(1/92) 2 of 2 <br />PARSBW <br />
The URL can be used to link to this page
Your browser does not support the video tag.