My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_1987-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 1:41:06 PM
Creation date
6/23/2020 6:53:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2001
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_1987-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. LEAK RECORDING AND REPORTING PROCEDURE- <br />Whenever <br />ROCEDUREWhenever an alarm is activated, station personnel are to immediately: <br />a Contact ARCO Maintenance or its designated agent by using the telephone number <br />previously provided. <br />b. If any visible indications of petroleum products or vapors are noticed call 911. <br />C. Make an entry in the Recordable Discharge Log (Form APPC-765-1: attached) <br />indicating the action taken. <br />d Complete the Recordable Discharge log when and as the source of the alarm is <br />known. <br />ARCO RESPONSIBILITIES <br />B. METHOD OF REMOVING AN UNAUTHORIZED RELEASE FROM THE SECONDARY <br />CONTAINMENT <br />a Any unauthorized release into the secondary containment system of a product <br />tank will be removed by pumping. Uncontaminated product may be returned to <br />the tank. Contaminated product may be returned to the refinery to be recycled <br />or may be disposed of following procedures in accordance with California Health <br />and Safety Code requirements. In the event of an emergency, a pumping <br />contractor or truck will be availabt6 immediately. In all other cases, <br />equipment availability will be within 12 hours. <br />b. Any unauthorized release in the secondary containment system of a used oil tank <br />will be pumped and disposed of following procedures in accordance with <br />California Health and Safety Code requirements for used oil disposal. <br />C. ARCO Maintenance will be responsible for authorizing and selecting <br />contractors for the work to be performed. <br />5. TRAINING <br />In addition to the training covering subjects mentioned in Sections 3 and 4 above, training <br />needed for the operation of the tank system and monitoring equipment includes: <br />How to: <br />- Take tank level measurements <br />- Read dispenser meters <br />- Inspect equipment <br />- Recognize warning signs: dispenser hesitations, meter spins and odors <br />- Manually close dispenser impact valve <br />- Replace dispenser filters <br />
The URL can be used to link to this page
Your browser does not support the video tag.