My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_1987-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 1:41:06 PM
Creation date
6/23/2020 6:53:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2001
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_1987-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h. <br />The field supervisor is <br />change depending on field conditions. <br />noted in the field log book. <br />Personnel may <br />Changes will be <br />Employee Training Assignments <br />All on-site employees will be trained in accordance with T8 CCR <br />5192 (e). The person serving as site Safety and Health Supervisor <br />will have completed a standard first aid course. <br />4. HAZARDS <br />Identified Physical Hazards <br />The presence of heavy equipment at this site presents the potential <br />for physical injury during the permanent closure. All heavy <br />equipment operators and workers around the equipment must be <br />constantly aware of the hazards associated with the operation of <br />that equipment. The following precautions will be taken during any <br />construction activity to prevent physical harm: <br />1. All heavy equipment at the site (backhoes, front-end <br />loaders, utility trucks, etc.) must be used only for the <br />purposes for which it was designed. Under no <br />circumstances will a piece of heavy equipment be used for <br />personnel lifts. <br />2. All vehicles with a haulage capacity of 2-1/2 cubic yards <br />or more must be equipped with an automatic electric back- <br />up alarm which is audible at a distance of 200 feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.