My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 1:53:18 PM
Creation date
6/23/2020 6:53:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i r <br /> GHAV <br /> �¢ <br /> IS, CIVIL ENGINEERING,LAND PLANNING,SURVEYING,ENVIRONMENTAL SERVICES <br /> Q� 'L May 14, 2008 <br /> STANDARD FEDERAL EXPRESS <br /> 0 2 (209)468-3420 <br /> S �y <br /> G�T'NG ENG\NF's <br /> Linda Trickett <br /> San Joaquin County `'` l b Z10t8 <br /> Environmental Health Department Itti"' <br /> 600 East Main Street n�Tti <br /> Stockton, CA 95202 <br /> PERMIT/SERVICES <br /> RE: UST Retrofit Permit Application <br /> EVR Phase I1 Upgrade <br /> ARCO Retail Fueling Facility <br /> 1617 West Fremont, Stockton, CA 95203 <br /> BP FAC No. 5450!Our Job No. 13448 <br /> Dear Linda: <br /> On behalf of our client, BP West Coast Products LLC, Barghausen Consulting Engineers, Inc. <br /> respectfully requests that the San Joaquin County Environmental Health Department review and approve <br /> the Underground Storage Tank Retrofit permit application for the EVR Phase II equipment upgrade to be <br /> completed at the existing ARCO fueling facility referenced above. <br /> Please be aware that the installation of the Healy Clean Air Separator(CAS) is mandated by the State of <br /> California Air Resources Board (GARB) and the San Joaquin Valley Air Pollution Control District <br /> (SJVAPCD). The CARB and the SJVAPCD require that this equipment be installed and operational by <br /> 2009. BP is submitting this application at this time to ensure that there is plenty of time to complete the <br /> installation prior to the GARB-imposed deadline. <br /> Enclosed for your review and approval are the following: <br /> 1. Two (2) copies of the signed UST Retrofit Permit Application, together with Owner's <br /> Authorization Letter and Scope of Work <br /> 2. Two(2) sets of wet-signed plans <br /> 3. One (1) Barghausen Consulting Engineers, Inc. check in the amount of$294, payable to San <br /> Joaquin Environmental Health Department for the plan check review fees <br /> The scope of work is as follows: <br /> • Retrofit existing dispensers with new EVR Phase Il equipment per CARB Exec. Order VR- <br /> 202-F <br /> • Install one(1) new Veeder-Root ISD pressure sensor at dispenser nearest the tanks <br /> • Install one(1)new Veeder-Root ISD vapor flow meter at each dispenser <br /> • Install the Clean Air Separator(CAS) on concrete pad <br /> 18215 72ND AVENUE SOUTH KENT,WA 98032 (425)251-6222 (425)251-8782 FAX <br /> BRANCH OFFICES 4 OLYMPIA,WA # TACOMA,WA # SACRAMENTO,CA 4 TEMECULA,CA <br /> www.barghausen.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.