My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 1:53:18 PM
Creation date
6/23/2020 6:53:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> TEST DATE: 08/05/08 8501 N MOPAC EXPRESSWAY,SUITE 400 WORK ORDER NUMBER: 2258592 <br /> AUSTIN,TEXAS 78759(512)451-6334 <br /> CLIENT: BP PRODUCTS NORTH SITE: ARCO #05450, CC 18022647 <br /> TANK INFORMATION <br /> Tank ID: 1 Tank manifolded: YES Bottom to top fill in inches: 144.0 <br /> Product: PREMIUM Vent manifolded: No Bottom to grade in inches: 150.0 <br /> Capacity in gallons: 11,976 Vapor recovery manifolded: YES Fill pipe length in inches: 45.0 <br /> Diameter in inches: 92.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 421 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DW FIBERG Installed: ATG Stage II vapor recovery: BALANCE <br /> CP installed on: <br /> COMMENTS <br /> CItC TEST EtESU1T5 Test Method; LEAK DETECTIOR.TIESTAESULTS Test m�t?tod: <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: RED JACKET <br /> Fluid volume in gallons: Model: Fx1v <br /> Tank water level in inches: S/N; 40707 6566 <br /> Test time: NOT Open time in sec: 3.00 <br /> Number of thermisters: TESTED Holding psi: 22 NOT <br /> Specific gravity: Resiliency cc: 100 TESTED <br /> Water table depth in inches: est leak rate ml/m: 189.0 <br /> Determined by(method): Metering psi: 10 <br /> Leak rate in gph: Calib.leak in gph: 3.00 <br /> Result: Results: PASS <br /> COMMENTS COMMENTS <br /> LINE TEST ULT$ Test <br /> t1LLAtaE >±STI2SULTSTsstMethod; type; <br /> Test time: Material: DW FIBERG <br /> Ullage volume: Diameter(in): 2.0 <br /> Ullage pressure: Length(ft): 100.0 <br /> Results: Test psi: <br /> Bleedback cc: <br /> DATA FOR UTS-4T ONLY: Test time(min):Test 1:Start time: <br /> Time of test 1: Finish psi: NOT NOT NOT NOT <br /> Temperature: NOT Vol change cc: TESTED TESTED TESTED TESTED <br /> Test 2:Start time: <br /> Flow rate(cfh): TESTED Finish psi: <br /> Time of test 2: Vol change cc: <br /> Test 3:Start time: <br /> Temperature: Finish psi: <br /> Flow rate(cfh): Vol change cc: <br /> Time of test 3: Final gph: <br /> Temperature: Result: <br /> Flow rate(cfh): Pump type: PRESSURE <br /> COMMENTS Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational: YES <br /> Printed 08/08/2008 18:23 KOHLMEYER <br />
The URL can be used to link to this page
Your browser does not support the video tag.