Laserfiche WebLink
Monitoring System Certification <br /> Site Address: 1617 W. FREMONT Date of Testing/Service: 08/05/2008 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 325.02 <br /> Complete the following checklist: <br /> X Yes No• Is the audible alarm operational? <br /> Q Yes No• Is the visual alarm operational? <br /> Q Yes No• Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br /> Q Yes ❑No interfere with their proper operation? <br /> Yes No• X N/A If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> Q Yes No' F�N/A monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down?(check all that apply) 0 Sump/Trench Sensors; Ex Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? 0 Yes No <br /> Q Yes E]No• ®N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device(Le.:no mechanical <br /> overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> properly? If so,at what percent of tank capacity does the alarm trigger? so % <br /> Yes' Q No Was any monitoring equipment replaced?if yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ® Yes` ®No Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) ❑Product; <br /> ❑ Water. If yes,describe causes in Section E,below. <br /> ® Yes No` Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,if applicable. <br /> Q Yes F-1 No• Is all monitoring equipment operational per manufacturers'specifications? <br /> *In Section E below,describe how and when these deficiences were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 Based on CA form dated 03/01 <br />