Laserfiche WebLink
Work Order: 2256078 <br /> by <br /> Emergency Stop (E-Stop) Testing Results & Checklist <br /> Site f YrV, Co_Name: -+ Date: 40I I <br /> Address: j fI] hr/r Phone: l-S 1�y <br /> City I St r+ Lead Te ciao• ASS <br /> eMaint.W.O,# Name: / <br /> L b s-1i"77f Signature: FALL Next Day Repair Required) [ ]The abjactivo of this test is to pravtde*$surancs that line when the E-$iep switch Is activated,all the fueling system circuits(turbines,and dlspensersi are do <br /> ensrglxed,and remain do-ork"lzed until they are resat menuallyl. The test pracedures and guldelirws shaii be in accardance wlih ttia E-Stop Testing Process. <br /> K Tu S+Mct <br /> W. 7ae!otlowing Wemidtr.1s fo ba cornpferad. Yas <br /> 1 Number of E-$top switches' <br /> -771 <br /> 2 Type of Switch? Push Pull _Momentary Plain light/Toggle Other: <br /> (if Momentary type,locate and identify re-set button): <br /> 3 Type of Turbine Control Relay System(Electrical Distribution Center): <br /> _Brown Box _Power Solution Other Custom Fabricated <br /> 4 Type of Turbine Control Relays: Make + - Model <br /> 5 Type of Line Leak Detection Mechanical ELDICPT PLLD <br /> am <br /> E 0 MIN 111E11111111 1111111 1111111 <br /> 5 Does the E-Stop shutdown power to the DISPENSERS <br /> 7 Does the E-Stop shutdown poorer to the TURBINES <br /> 8 is the 220 voltage to the turbine relay removed{both sides of the relay) <br /> 9 Are the TURBINE BREAKERS clearly Pdentified t labeled �- <br /> 10 Did the E-Stops)funclion correctly(de-energized from bath sides of the relay) <br /> 10A If 010 is NO,briefly describe what was wrong: <br /> 1013 How was it oorrected: <br /> 10C If repair or E-Stop functionality can not be corrected same day(prior to leaving the site). The technician MUST notified <br /> the Site Manager of the problem,place an"Out of Service"Tag on the E-Stop(s),and identified an alternate mean for <br /> Site shutdown in the event of an emergency. <br /> 10D The Elite Customer$olutton Center has been contacted for the repair. <br /> W.O.Ticket 9 <br /> 11 Site's fueling system is fully operational, <br /> 12 All equipment secured and anyaecess ports,lids,enclosures are dosed. <br /> 13 All safety barricades,and any debris was been removed. <br /> Tanknology Inc. 8501 N.MoPac Expressway,Suite 400,Austin,Texas 78759 <br />