Laserfiche WebLink
SWRCB.January 2002 Pa(_ie 2 . <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested: <br /> Test Method Developed By: Spill Bucket Mall ufacturerFx� Industry Standard Professional Engineer <br /> Other(Specifjy <br /> Test Method Used: Pressure 1-1 Vacuum 1XI Hydrostatic <br /> Other(Specifj) <br /> Test Equipment Used: Equipment Resolution: <br /> a1/1555-1-RE <br /> Spill Bos# 1 REG FILL Spill Box# 2 REG FILL Spill Box# 3 PRE FILL Spill Bos# <br /> Bucket Diameter: 12 12 12 <br /> Bucket Depth: 13 .50 13 .50 14 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 5 5 <br /> starting test: <br /> Test Start Time: 0 915 0 915 0 915 <br /> Initial Reading(RI ): 10 10 8 .75 <br /> Test End Time: 1015 1015 1015 <br /> Final Reading(RF ): 10 10 8 . 75 <br /> Test Duration: 60 MINS. 60 MINS. 60 MINS. <br /> Change in Reading(R F - Rt ) 0 0 0 <br /> Pass/Fail Threshold or P P P <br /> Criteria: <br /> I' st Rsaltass Fart Pais1717-1 exit,,' „ Pass )Earl .Pass Fail <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for.failed tests) <br />