Laserfiche WebLink
Work Order: 2248887 <br /> Emergency Stop Switch Test <br /> vi <br /> WO#I Date 2. <br /> SVB# <br /> Street address /.-/7 <br /> t✓ �''` `"Y <br /> City,ST <br /> Total Time Testing E-Stop 5 r <br /> Shut Down <br /> Location of Estop Turbine(YIN) Dispenser(YIN) CommentsfRepalm <br /> Outside Wall <br /> Inside Wall P, <br /> Other <br /> Did ESO function correclly{remove 220 From both sides of the relay)? N0 <br /> Test Result(PASS / FAIL) 1 �4��/ <br /> If the test FAILS call the Elite Customer Solutions Center hmttediately. <br /> Date f Time 1 Name at Help Desk rtoti d <br /> if the test FAILS teach the site personnel altsmativc emergency shut down procedure <br /> le.g.Circuit breakers,purnE controller <br /> Vaft I Torte I Name at employee trained <br /> tf system does not turn back on when the Estop is reacnvated,the site personetl are to vontact the BP Help Desk. <br /> The Flelp desk will talk them through resetting the EStop and I or+issue a 4 hour contractor response. <br /> Technician Signature I Date <br /> 8F l��- 97 <br /> C:',Documents and SettingsNCwne&ocal SethngsWemporary Internet FilesIOLKB(ABP E-STOP test Fonn.-rev-20V)ds <br /> Tanknolo-y Inc. 8501 N. MoPac Expressway, Suite 400, Austin,Texas 78759 <br />