Laserfiche WebLink
1 0 0 <br /> 3. Piping Leak Detection Monitoring Equipment <br /> Monitoring Method Manufacturer Model Monitoring Frequency <br /> Sump leak sensors connected to <br /> continuous monitoring system Veeder Root 794380-344-fill sumps <br /> Specify type: Continuous <br /> rl Discriminating 794380-323-turbine <br /> 0 Non-discriminating <br /> ❑Mechanical line leak detectors with <br /> programmed leak threshold of three <br /> gallons per hour <br /> Electronic line leak detectors with Red Jacket CPT <br /> programmed leak threshold of: Every pumping cycle <br /> El 0.1 gph 00.2 gph 03 gph <br /> ❑ Line integrity testing by: <br /> F1 Electronic line leak detector is <br /> equipped to conduct line tightness F1 Annually <br /> testing 0 Other: <br /> []Third party testing <br /> 0 Not reguired <br /> El Other(Specify): <br /> 4. Dispenser Leak Detection Monitoring Equipment <br /> Monitoring Method Manufacturer Model Monitoring Frequency <br /> El Mechanical float in dispenser Continuous <br /> containment <br /> 0 Electronic leak sensor in dispenser <br /> containment: Veeder Root 794380-323 Continuous <br /> ❑ Discriminating <br /> Non-discriminating El Daily <br /> F1 Visual inspection El Other: <br /> ❑No under-dispenser containment <br /> ❑Other(specify): <br /> 5. Positive Shutdown Capabilities <br /> 0 System does not have positive shutdown capabilities <br /> El Individual dispenser shutdown will occur whenever release is sensed in under-dispenser containment <br /> Automatic pump shut off will occur whenever: <br /> Release is sensed in turbine sump <br /> Release is sensed in primary piping <br /> Release is sensed at dispenser <br /> Monitoring system is disconnected or fails in any way(fail safe) <br /> n Other(specify): <br /> 6.Secondary Containment Testing <br /> ❑Secondary containment is not tested <br /> In the State of California,secondary containment systems installed on or after January 1,2001,shall be tested upon installation, <br /> six months after installation,and every 36 months thereafter. Secondary containment systems installed prior to January 1,2001, <br /> shall be tested by January 1,2003,and every 36 months thereafter. <br /> 7. Annual Equipment Certificationrresting <br /> Annually <br /> ❑Other city): <br /> 2 <br />