Laserfiche WebLink
SWRCB,January 2002 0 0 Page 2. <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: El <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: El <br /> Test Method Developed By: R Spill Bucket Manufacturer ❑X Industry Standard ❑ Professional Engineer <br /> Other(Spec) <br /> Test Method Used: F] Pressure Vacuum R Hydrostatic <br /> ❑ Other(Spec) <br /> "Diameter: <br /> : Equipment Resolution: <br /> Spill Box# 87 MASTR Spill Box# 87 SLAVE Spill Box# 91 Spill Box# <br /> 12 12 12 <br /> Bucket Depth: 14 14 14 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 5 5 <br /> starting test: <br /> Test Start Time: 0930 0930 0930 <br /> Initial Reading(Ri ): 9 8 8 <br /> Test End Time: 1030 0940 1030 <br /> Final Reading(RF ): 9 6 8 <br /> Test Duration: 60 MINS. 10 MINS. 60 MINS. <br /> Change in Reading(R F-Rt ) 0 2 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: x Pass Fail Pass % Fail % Pass Fail Pass Fail <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 87 SLAVE FILL SPILL BUCKET HAS TEAR IN BELLOWS. CALLED MAINT. <br />