My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 1:53:18 PM
Creation date
6/23/2020 6:53:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 0 0 Page 2. <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: El <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: El <br /> Test Method Developed By: R Spill Bucket Manufacturer ❑X Industry Standard ❑ Professional Engineer <br /> Other(Spec) <br /> Test Method Used: F] Pressure Vacuum R Hydrostatic <br /> ❑ Other(Spec) <br /> "Diameter: <br /> : Equipment Resolution: <br /> Spill Box# 87 MASTR Spill Box# 87 SLAVE Spill Box# 91 Spill Box# <br /> 12 12 12 <br /> Bucket Depth: 14 14 14 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 5 5 <br /> starting test: <br /> Test Start Time: 0930 0930 0930 <br /> Initial Reading(Ri ): 9 8 8 <br /> Test End Time: 1030 0940 1030 <br /> Final Reading(RF ): 9 6 8 <br /> Test Duration: 60 MINS. 10 MINS. 60 MINS. <br /> Change in Reading(R F-Rt ) 0 2 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: x Pass Fail Pass % Fail % Pass Fail Pass Fail <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 87 SLAVE FILL SPILL BUCKET HAS TEAR IN BELLOWS. CALLED MAINT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.