My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 1:53:18 PM
Creation date
6/23/2020 6:53:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/03/2008 15:35 FAX 425 251 8782 BARGHAUSEN ENGINEERS 10001/003 <br /> �i�. ►G14A <br /> CIVIL ENGINEERING.LAND PLANNING,SURVEYING,ENVII I: VMENTAL SERVICES <br /> r(F <br /> 0 z June 3.2008 <br /> Facsimile: (209)468-3433 <br /> G<�Ne RN6eN� 9 <br /> Mr. Raymond von Flue <br /> San Joaquin County <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton, CA 95202-3029 <br /> RE: Response to Comments <br /> UST Retrofit Permit Application for EVR Phase li Upgrade <br /> ARCO Retail Fueling Facility <br /> 1617 West Fremont, Stockton, California 95203 <br /> BP Fac.No.5450/Our Job No. 13448 <br /> Dear Mr. von Flue: <br /> The following outline provides each of your comments in italics exactly as written in yo+.r June 3, 2008 <br /> letter,along with a narrative response describing how each comment was addressed: <br /> 1. The name and address of a licensed contractor in the state of'californla. <br /> Response: The contractor selected for this project is Fillner Construction Inc., 4z;) Yankee' <br /> Hill Road, Suite 200,Rocklin,CA 95677. <br /> 2. Submit revised scope of work.for installing Veeder Root product line leak dd.,.--clots, as <br /> referenced on the plans that were submitted. <br /> Response: This project does not include the installation of PLLDs. Therefore, ► o revised <br /> Scope of Work is necessary. <br /> 3. Submit information on how the new Veeder Root monitoring panel will he corner ted to the <br /> existing Red Jacket CPT system. <br /> Response: Pursuant to my conversation with you on June 3, 2008, you will coc r'Anate this <br /> with the installation contractor. <br /> 18215 72ND AVENUE SOUTH KENT,WA 98032 (425)251-6222 (425)251-8782 FAX <br /> BRANCH OFFICES ® OLYMPIA,WA A TACOMA,WA ♦ SACRAMENTO,CA ® TEMECULA, <br /> www.barghausen.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.