Laserfiche WebLink
San Joaquin un <br /> � R <br /> Environmental Health Department <br /> °raE��°� <br /> ? -- Donna Herm,REHS <br /> a. 600 East Main Street <br /> a: a PROGRAM COORDINATORS <br /> Stockton, California 95202-3029Robert tvtccteiton,RHs <br /> Jeff Carruesco,REHS.RDI <br /> Website: .sJg . ehd Foley,REHS <br /> ovo Linda Tur <br /> Phone: (209) 9-3420 <br /> Fax. (209)464-0138 <br /> MAR 3 0 2011 <br /> APPLICATION FOR UNDERGROUND STORAGE TANK <br /> RETROFIT OR PIPING REPAIR PERMIT BNIT/ E VI ESLT <br /> [] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to <br /> the applicant with comments. <br /> [] 2. Include a detailed site map on a separate sheet of paper showing all work to be done. Include the location <br /> of the tanks(s), piping, all tank-related appurtenances, streets, adjacent properties (north toward the top of the <br /> page), nearby septic tanks, leachfields,water wells, buildings, underground public utility lines (including water, <br /> sanitary sewer and storm sewer), and distance of piping from tank to dispensers. If underground utilities are <br /> not included on the site map, you must state in writing that USA Dig will be contacted prior to excavation <br /> activities. <br /> [] 3. Complete pages 3-6, "APPLICATION FOR UNDERGROUND STORAGE TANK RETROFIT OR PIPING <br /> REPAIR PERMIT". NOTE: If sampling is required, sampling firm shall be an independent third party from the <br /> contractor performing the work. <br /> [] 4. Complete page 7, "Authorization to Release". This form must be signed and dated by the <br /> OWNER/OPERATOR of the facility. <br /> [] 5. Submit a completed "Service Request"form and"Underground Storage Tank Program Fee Worksheet". <br /> [] 6. If performing any excavation activities, and the facility is located outside of the city limits, submit a "Backfill <br /> Excavation Certificate" as required by the San Joaquin County Building Department. If a "Backfill <br /> Excavation Certificate" is required by any incorporated areas (cities), submit to the appropriate City Building <br /> Departments, pursuant to the Uniform Building Code STD 70-11. <br /> [] 7. The maximum review time for Plan Review is 15 working days from receipt of the adequately completed <br /> plan. If gross deficiencies are identified, an addendum will be required with a $122.00 per hour fee and the <br /> review will begin on the date of resubmittal. <br /> [] 8. Advance inspection notice of at least 48 hours is required by the Environmental <br /> Health Department (EHD). <br /> [] 9. Contractor to Provide: Combustible/Flammable gas detector (to verify the Lower Explosive Limit (LEL) <br /> atmosphere and oxygen level), adequate number(s) and appropriate type(s) of fire extinguisher(s), and <br /> barriers to secure the area as necessary to minimize traffic and pedestrian interference. It shall be the project <br /> manager's responsibility for compliance with all health & safety regulations and requirements, including <br /> confined space requirements, which shall be strictly adhered to at all times during the course of the <br /> underground storage tank(UST)activities. <br /> [] 10. The EHD permit shall be on site during all UST permit-related activities. <br /> [] 11. Any changes in this document shall be approved by the EHD prior to initiating work. All changes to any <br /> work must be described in detail on pages 3&4 and be shown on the detailed site map. <br /> 1 <br />