Laserfiche WebLink
• • <br /> nl, Emergency Shut-Off (ESO) Testing Results & Checklist <br /> F �,1ty lnfortnationContractor Information Test Results <br /> Site# JArco 5450 Co.Name: Wayne Perry Date: 09/23/10 <br /> Addr. 1617 W Fremont St. Phone: 916-646-9680 <br /> Cit /St:Stockton,CA 95203 Lead Tech: Brandon Smith El PASS <br /> eMaint.W.O.# 9703238 Name: Brandon Smith or <br /> Pass ort#: 19375153-- ❑ FAIL(Next Day Repair Required) <br /> Signature: i <br /> The objective of this test is to provide assurance that when the ESO switch is activated,all the fueling system circuits(turbines,and dispensers)are de- <br /> energized,and remain de-energized until they are re-set manually. The test procedures and guidelines shall be in accordance with the ESO Testing Process. <br /> # The following information is to be completed. X To Select <br /> Yes I No INIA <br /> StT (Y-ANA <br /> 1 Number of ESO switches: 1 3 <br /> 2 Type of Switch 0 Push Pull ❑ Monentary ❑ Plain light/Toggle ❑ Other: <br /> if Momentary type,locate and identify re-set button): <br /> 3 Type of Turbine Control Relay System(Electrical Distribution Center): <br /> ❑ Brown Box ❑ Power Solution ❑ Custom Fabricated ❑Carolina Box Other } <br /> 4 Type of Turbine Control Relays: Make Red Jacket Model VST " <br /> 5 Type of Line Leak Detection: ❑ Mechanical 0 ELD!CPT ❑ PLLD <br /> ` . <br /> Te R R1f1fE NGE TEST...; <br /> 6 Does the ESO shutdown power to the DISPENSERS? p ❑ r <br /> 7 Does the ESO shutdown power to the TURBINES? VI 0 <br /> Is the 220 voltage to the turbine relay removed(either the line side or the motor side of the contacts or the coil)? ❑ <br /> 8 <br /> 9 Are the DISPENSER BREAKERS clearly identified/labeled? p ❑ <br /> 10 Are the TURBINE BREAKERS clearly identified/labeled? © ❑ <br /> 11 Are all the ESOs accessible and clearly identified/labeled? 0 ❑ <br /> Did the ESO(s)function correctly(de-energized from either the line side or the motor side of the contacts or the coil)? p ❑ <br /> 12 <br /> If#12 is NO,briefly describe what was wrong: ' <br /> 12A <br /> How was it corrected: <br /> 12B <br /> 12C If repair or ESO functionality cannot be corrected same day(prior to leaving the site). The technician MUST notify the <br /> Site Manager of the problem,place an"Out of Service"Tag on the ESO(s),and identify an alternate mean(i.e.,locate <br /> circuit panel,clearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br /> 12D Elite Customer Solution Center has been contacted for the repair. <br /> eMaint.W.O.Ticket# ❑ ❑ : <br /> POS?r'F��T <br /> 11 Site's fueling system is fully operational. O ❑ <br /> 12 All equipment secured and any access ports,lids,enclosures are closed. El ❑ <br /> 13 All safety barricades,and any debris was been remove( ❑ <br /> COMMENTS <br /> 87 Main Has Electronic and 91 has a mechanical. <br /> Submit completed copy with other documentation in,E-Maintenance. <br />