Laserfiche WebLink
0 <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES [ ] 490 <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): j �7 <br />g pICVet One_ VfOedar (200-tSe�sedr jJ c_Qjf�,c� �l +^E c�7 { <br />.V' I : l I SVrMP. SenSvr- ;,-\ `'Sensor cwi" glctrn . Pepiaced <br />0 <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />cine_ — Veeder- eco -t Sen.SOr - _701"13410-3V-1 <br />