Laserfiche WebLink
Emergency Shut -Off (ESO) Testing Results & Checklist <br />"`2Gilt [ormaYron Coifr'actor.Infprmatr�n„” Tesi Results. <br />Site # Arco 5450 Co. Name: Wayne Perry Date: 09/23/10 <br />Addr. 1617 W Fremont St. Phone: 916.646-9680 <br />Cit /St: Stockton CA 95203 Lead Tech: Brandon Smith 0 PASS <br />eMaint. W.O. # 9703238 Name: Brandon Smith or <br />Pass ort#: 1937515 ❑ FAIL (Next Day Repair Required) <br />Si nature: c <br />r <br />The objective of this test is to provide assurance that when the ESO switch is,a tivated, all the fueling system circuits (turbines, and dispensers) are do. <br />energized, and remain de -energized until they are re -set manually. The test procedures and guidelines shall be in accordance with the ESO Testing Process. <br />X To Select <br /># The following Information Is to be completed. <br />Yes No N/ <br />1 Number of ESO switches: 1 <br />2 Type of Switch 0 Push Pull ❑ Monentary ❑ Plain light/Toggle ❑ Other: <br />if Momentary type, locate and identify re -set button): <br />3 Type of Turbine Control Relay System (Electrical Distribution Center): <br />❑ Brown Box ❑ Power Solution ❑ Custom Fabricated ❑ Carolina Box Other <br />4 IType of Turbine Control Relays: Make Red Jacket Model VST <br />5 Type of Line Leak Detection: 0 Mechanical 0 ELD / CPT ❑ PLLD <br />_4 MWEI <br />6 Does the ESO shutdown power to the DISPENSERS? ❑ ❑ <br />7 Does the ESO shutdown power to the TURBINES? 0 ❑ <br />Is the 220 voltage to the turbine relay removed (either the line side or the motor side of the contacts or the coil)? 0 ❑ <br />8 <br />9 Are the DISPENSER BREAKERS clearly identified / labeled? 0 ❑ <br />10 Are the TURBINE BREAKERS clearly identified / labeled? 0 ❑ <br />11 Are all the ESOs accessible and clearly identified / labeled? 0 ❑ <br />Did the ESO(s) function correctly (de -energized from either the line side or the motor side of the contacts or the coil)? 0 ❑ <br />12 <br />If #12 is NO, briefly describe what was wrong: <br />12A <br />How was it corrected: <br />12B <br />12C If repair or ESO functionality cannot be corrected same day (prior to leaving the site). The technician MUST notify th <br />Site Manager of the problem, place an "Out of Service" Tag on the ESO(s), and identify an alternate mean (i.e., locat <br />circuit panel , clearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br />Elite Customer Solution Center has been contacted for the repair. L3 U <br />12D ❑ 13eMaint. W.O. Ticket # <br />11 Site's fueling system is fusfull operational. 0 ❑ <br />12 All equipment secured and any access ports, lids enclosures are closed. ® ❑ <br />13 All safetv barricades and any debris was been remove( ® O <br />rONi �yS <br />� � �. .t* :a � r `� :. fir, .t+t a� � , •�,.: Frl�1'�: � t a r ia+ te. <br />87 Main Has Electronic and 91 has a mechanical. <br />Submit,comgieted copy with other documentation in E -Maintenance: <br />