My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2009-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 2:05:50 PM
Creation date
6/23/2020 6:54:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2011
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_2009-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ua <br /> °a4 'coy SAN JOAQUIN COUNTY <br /> y ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, CA 95202-3029 <br /> c•.: .� P <br /> Telephri-j:(209)468-3420 Fax:(209)468-3433 Web:www.sjgov.org/ehd <br /> UNDERGROUND STORAGE TANK (VST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br /> Facility Name: /PIAInspection Dater <br /> rc <br /> Facility Address: Service Request#: <br /> Onsite Service Technician's Name: ICC Service Technician/Installer Exp.Date: Manufacturer Training. <br /> C �' 9:79It 3 1W201 <br /> G <br /> SERVICE SERVICE <br /> Leak detectorSpill bucket ❑ minimum 5 gallon <br /> ❑ mechanical M4,f'eW CPT <br /> electronic Serial: El 1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ line test ro rammed ❑ Caldwell System ❑ Other <br /> Leak detector <br /> ❑ mechanical ModelSpill bucket ❑ minimum 5 gallon <br /> El ❑ electronic Serial:: El 1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ line test ro rammed ❑ Caldwell System ❑ Other <br /> sensor <br /> El positive shutdown Model: ❑ Primary piping testing at: <br /> ❑ fail safe Serial#: psi <br /> ❑ NA minutes <br /> sensor Secondary containment testing for: <br /> ❑ ❑ positive shutdown Model: UDC(s) Piping <br /> ❑ fail safe Serial#: Sump(s) UST(s) <br /> ❑ NA <br /> sensor ❑ Testing for the above components are next due by: <br /> ❑ ❑ positive shutdown Model: <br /> ❑ fail safe Serial#: Note: Please be aware that 2e containment components are required to be tested upon <br /> ❑ NA installation,6 months after,and every 36 months thereafter. <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Cold start of monitoring panel <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Corrosion protection <br /> ❑ Overfill prevention (see LIS letter 150-1) ❑ Other: see below <br /> This UST facility is APPROVED to operate ❑ This UST facility is NOT APPROVED to operate <br /> L (CPT <br /> d <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspe Received By: Title: <br /> EHD 23-04 UST SERVICE REQUEST INSPECTION REPORT <br /> Rev 10/06/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.