Laserfiche WebLink
by GR Job# 20-631615 <br /> Emergency Shut-Off (ESO) Testing Results & Checklist <br /> Facility Information Contractor Information TEST e <br /> Site# 5450 Co. Name: Gettler-Ryan Inc. Date: 712812015 <br /> Address: 1617 W Fremont St Phone 925-551-7555 AUG 12 - <br /> City/St: Stockton Lead Technician: Joey Mesa x PASS <br /> eMaint.W.O.# 9984307 Name: or 11-ENVIRONMENT/J... <br /> Passport: FAIL(Next Day Repair R*EjtlSrodr?c-)Ac—gncah, <br /> Signature <br /> The objective of this test Is to provide assurance that the when the EStop switch Is activated,all the fueling system circuits(turbines,and dispensers)are de-energized,and <br /> remain de-energized until they are reset manually). The test procedures and guidelines shall be in accordance with the Estop Testing Process. <br /> # The following Information Is to be completed. x To$WW <br /> Y" No WA <br /> SITE DATA <br /> 1 Number of E-Stopswitches: 2 <br /> 2 Type of Switch? Push Pull X Momentary_ Plain light/Toggle` Other: <br /> (if Momentary type,locate and identify reset button): In Elect Room <br /> 3 Type of Turbine Control Relay System(Electrical Distribution Center): <br /> Brown Box _Power Solution X Other Custom Fabricated <br /> 4 Tfpe of Turbine Control Relays: Make FE Petro Model MAG VFC <br /> 5 11pe of Line Leak Detection: Mechanical ELD/CPT X PLLD <br /> PERFORMANCE TEST <br /> 6 Does the E-Stop shutdown power to the DISPENSERS x <br /> 7 Does the E-Stop shutdown power to the TURBINES x <br /> 8 Is the 220 voltage to the turbine relay removed(either the line side or the motor side of the contacts or the coil)? x <br /> 9 Are the DISPENSER BREAKERS clearly identified/labeled? x <br /> 10 Are the TURBINE BREAKERS clearly identified/labeled? x <br /> 11 Are all the ESOs accessible and clearly identified/labeled? x <br /> 12 Did the ESO(s)function correctly(de-energized from either the line side or the motor side of the contacts or the coil)? x <br /> 12A If#12 is NO,briefly describe what was wrong: <br /> 12B How was it corrected: <br /> 12C If repair or ESO functionality cannot be corrected same day(prior to leaving the site). The technician MUST notify the Site <br /> Manager of the problem, place an"Out of Service"Tag on the ESO(s),and identify an alternate mean(i.e.,locate circuit <br /> panel,clearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br /> 12D Elite Customer Solution Center has been contacted for the repair. <br /> eMaint.W.0.Ticket# <br /> POST TEST <br /> 11 Site's fueling system is fully operational. x <br /> 12 All equipment secured and any access ports, lids,enclosures are closed. x <br /> 13 All safety barricades,and any debris was been removed. x <br /> COMMENTS <br /> Submit completed copy with other documentation In E-Maintenance. <br />