Laserfiche WebLink
t <br />6EmER-RYAN INC. GR .Job # 10-062101.1 <br />FA <br />F. In -Tank Gauging / SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Cern !eh the fnllnv inn rherklrst• <br />In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Cmmnlata tha fnllnwinn rhackltst <br />ff <br />Ij <br />r es <br />❑ <br />o <br />Has all input wiring been inspected for proper entry and termination, Including testing for ground faults? <br />11 <br />Yes <br />❑ <br />No' <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ <br />[3 <br />Yes <br />❑ <br />No' <br />Was accuracy of system products level readings tested? <br />No` <br />ra <br />Yes <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />For Mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Ij <br />Yes <br />❑ <br />No' <br />Were all probes reinstalled properly? <br />ff <br />rg <br />Yes <br />1 ❑ <br />No' <br />IWere ad items on the equipment manufacturers maintenance checklist completed? <br />In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Cmmnlata tha fnllnwinn rhackltst <br />ff <br />Yes <br />❑ <br />o <br />or equipment start-up or annual equipment certification, was a leak simulated to verify ormance? (check a# <br />❑ <br />N/A <br />that apply) Simulated leak rate: ® 3 g.p.h. ❑ 0.1 g.p.h. ❑ 0.2 g.p.h. <br />Yes <br />❑ <br />No' <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />[j <br />Yes <br />❑ <br />No` <br />Was the testing apparatus properly calibrated? <br />[] <br />Yes <br />❑ <br />No` <br />For Mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />ff <br />N/A <br />ff <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off H the LLD detects a leak? <br />❑ <br />N/A <br />r, <br />Yes <br />❑ <br />No' <br />For electronic LLDs, roes the turbine automatically shut off If any portion of the monitoring system is disabled or <br />❑ <br />N/A <br />Disconnected? <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />❑ <br />N/A <br />fails a test? <br />Yes <br />® <br />No" <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® <br />N/A <br />Ij <br />Yes <br />1 ❑ <br />No' <br />1were all items on the equipment manufacturer's maintenance checklist completed? <br />' In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Comments: <br />VIE G% OV ML) <br />2014 <br />Monitoring System Certification Page 3 of 4 12107 <br />WOAt <br />3 <br />