Laserfiche WebLink
Gf rrait -RYAN INC. GR Job # 20-601659 <br />F. In -Tank Gauging / SIR Equipment: [I Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if In -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the foilowino checklist: <br />IX <br />es <br />❑ <br />o <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />ff <br />Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />[j <br />Yes <br />❑ <br />No* <br />Was accuracy of system products level readings tested? <br />(Z <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />[g <br />Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />a <br />Yes <br />1 ❑ <br />No* <br />lWere all items on the equipment manufacturer's maintenance checklist completed? <br />- in ine aecuon n, oeiow, oescrroe now aro wren uiese oencrencres were or viii oe correccea. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Cmmnlete the faiinwina checklist: <br />- in cne aec:oon n, oerow, aescrroe now ana wnen urese aenc'encees were or wne oe correccea. <br />G. Comments: <br />Monitoring System Certification Page 3 of 4 12/07 <br />10 <br />Yes <br />❑ <br />o <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (check all <br />❑ <br />N/A <br />that apply) Simulated leak rate: ® 3 g.p.h. ❑ 0.1 g.p.h. ❑ 0.2 g.p.h. <br />Yes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />(i <br />Yes <br />❑ <br />No* <br />Was the testing apparatus property calibrated? <br />❑ <br />Yes <br />❑ <br />No* <br />For Mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />N/A <br />rg <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />N/A <br />rL <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />❑ <br />N/A <br />Disconnected? <br />Ij <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />❑ <br />N/A <br />fails a test? <br />Ii <br />Yes <br />❑ <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ <br />N/A <br />ff <br />Yes <br />❑ <br />No* <br />were all items on the equipment manufacturer's maintenance checklist completed? <br />- in cne aec:oon n, oerow, aescrroe now ana wnen urese aenc'encees were or wne oe correccea. <br />G. Comments: <br />Monitoring System Certification Page 3 of 4 12/07 <br />10 <br />