Laserfiche WebLink
bp GR Job# 17202518 <br /> rt§REmergency Shut-Off (ESO) Testing Results & Checklist <br /> Facility inf®resin®ncotzactor ft�f®irmai�on TEsr R oils <br /> Site#Arco 5450 Co. Name: Gettier-Ryan Inc. Date:7/2 0/2 017 <br /> Address: Phone 925-551-7555 <br /> 1617 W Fremont Street Lead Technician: x PASS <br /> CRY I St:Stockton, CA Name:Gilb t Garcia or <br /> eMaint.W.O.# Passport: FAIL(Next Day Repair Required) <br /> 5 nature <br /> The objective of this test Is to provide assurance that the when the Estop switch is activated,all the fueling system circuits(turbines,and dispensers)are de-energized,an <br /> remain de-energized until they are reset manually). The test procedures and guidelines shalt be In accordance with the E-Stop Testing Process. <br /> # The following Information Is to be completed. x To salad <br /> Yaa o A <br /> SITE`DATA <br /> - <br /> 1 Number of E-Stop switches: 2 <br /> 2 Type of Switch? Push Pull MomentaryX Plain light/Toggle Other <br /> (if Momentary type, locate and identify re-set button). In Elect Room <br /> s Type of Turbine Control Relay System(Electrical Distribution Center): <br /> Brown Box Power Solution Other Custom Fabricated <br /> a Type of Turbine Control Relays: Make E9 2Z1ZQ Model <br /> 5 TVDe of Line Leak Detection: Mechanical ELD/CPT 1 PLLD <br /> PERF®1k" CE'fEtr <br /> s Does the E-Stop shutdown power to the DISPENSERS <br /> 7 Does the E-Stop shutdown power to the TURBINES <br /> 8 Is the 220 voltage to the turbine relay removed(either the line side or the motor side of the contacts or the coil)? <br /> 9 Are the DISPENSER BREAKERS dearly identified/labeled? <br /> 10 Are the TURBINE BREAKERS dearly identified/labeled? <br /> 11 Are all the ESOs accessible and clearly identified/labeled? <br /> 12 Did the ESO(s)function correctly(de-energized from either the line side or the motor side of the contacts or the coil)? <br /> 12A If#12 is NO,briefly describe what was wrong: <br /> 12B How was it corrected: <br /> 12C If repair or ESO functionality cannot be corrected same day(prior to leaving the site). The technician MUST notify the <br /> Site Manager of the problem, place an"Out of Service"Tag on the ESO(s),and identify an alternate mean(i.e.,locate <br /> circuit panel,clearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br /> 12D Elite Customer Solution Center has been contacted for the repair. <br /> eMaint.W.O.Ticket# <br /> POST PEST _ <br /> 11 Site's fueling system is fully operational. .x <br /> 112 All equipment secured and any access ports,lids,enclosures are closed. x <br /> 13 JAII safety barricades,and any debris was been removed. x <br /> W ENT8 <br /> Via..l <br /> EtItcompleted copy with other documentation In E-Maintenance. <br />