My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2014-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 2:13:24 PM
Creation date
6/23/2020 6:54:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2017
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\1617\PR0231923\UST RETROFIT PLAN 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRODUCT #1 (_ <br />1--1 /2"N.P.T. INLET <br />L.,11/2" CONCRETE <br />ANCHORS BOLTS <br />L_ <br />„ x 2„ <br />ANCHO' <br />PRGDUCI IT/_ � „,.,,",,,/ <br />1" NJ F'.T. VAPOR <br />/ERY OUTLET, <br />)NAI._) <br />DISPE.., NSER CONVERSION FRAME <br />SCALE: N.T.S. <br />SUMP SENSOR <br />J --BOX <br />DISPENSER SKIN --- <br />ELBY CAPPED ELBOW <br />(TYP.) <br />SEAL. OFF (fYP.) <br />1" INTERCOM <br />CONDUIT <br />POWER DATA _ <br />_ <br />CONDUIT <br />1' MONITORING <br />CONDUIT <br />2" INSIDE 3" FRP <br />PRODUCT LINE <br />3" D.W. BONDED FRP <br />ENTRY FITTING W/ 4"x3" <br />CONCENTRIC REDUCER <br />SUMP LIQUID <br />MONITORING SENSOR <br />IN HOLDER <br />0 <br />PRODUCT SHEAR <br />" - --- DISPENSER VALVE (IYP.) <br />J ---BOX <br />_._...__ PIPING UNIONS <br />�--"—" BY WAYNE <br />VAPOR SHEAR <br />VALVE: <br />✓ <br />DISPENSER <br />l -ISLAND <br />-.___ LlI\TVI.._ <br />_ <br />1-1/2"x`18" FLEX <br />_ - ------ CONNECT. <br />2 .W. FRP VAPOR <br />INE <br />2" S.W. BONDED RIGID <br />FIBERGLASS FITTING <br />UNDER DISPENSER <br />CONTAINMENT SUMP <br />R--R FRONT VIEW ',�_)`ECTIOIN' DETAIL @ DISPEIN'SER Sump <br />SCALE.: N.T.S. <br />WAYNE OVATION DISPENSER <br />DISPENSER SUMP FRAME...----� <br />ANCHOR (BOLT MOUNTING FLANGES.__._ <br />2" FRP ELBOW WITH 2" FRP X <br />1.-1/2" FNPT BUSHING <br />2' S.W. BONDED RIGID <br />FIBERGLASS FITTING <br />2" SINGLE WALL_ FRP <br />RECOVERY LINE - <br />3" OVER 2" D.W. _.... <br />FRP PRODUCT LINE <br />----PEA GRAVEL_ <br />3" D.W. BONDED FRP ENTRY <br />FITTING W/ 4.,x3" <br />CONCENTRIC REDUCER <br />C; <br />— VAPOR SHEAR VALVE <br />PRODUCT SHEAR VALVE <br />PIPING, UNIONS BY WAYNE <br />SIDE VIEW SECl_I0N_@ DISPENSER 3UMP <br />SCALE: N.T.S. <br />IN'EW + Yin__ <br />SCALE, 1 ww = 1'-O9w <br />HErALY PUMP <br />EXISTING 2 -WAY <br />CALIBRATION VALVE <br />1-0 REMAIN <br />EXISTING 1 " <br />SHORT NIPPLE TO <br />REMAIN <br />DISPENSER WITH NEW_ PHASE <br />-- EXISTING VAPOR PRESSURE <br />SENSOR (1 PER SITE=) <br />O O Q <br />I _ <br />HANGING HARDWARE <br />REMOVE COPPER <br />TUBES & FITTINGS <br />p a <br />REMOVE EXISTING VAC <br />___ _ --------- - ASSIST VAPOR FLOW <br />Mf.:_TER SENSOR <br />EXISTING 2 -WAY <br />E=XISTING VAPOR CALIBRATION VALV.. <br />SHEAR VALVE TO REMAIN <br />EXISTING 1/4" OC COPPER <br />TUBING TO REMAIN. 1 " SNORT NIPPLE <br />EXISTING <br />CONTAINMENT- <br />VAPOR RETURN <br />SUMER 1-0 REMAIN ,__.. <br />_ _ <br />___ - BACK TO TANKS <br />F EA mY_ Y Y ASS E - .__I I.. _. <br />`::SCALE: NTS <br />[IIS"TAIE.m_S <br />DYMO DETAIL L -(EXS T NCS <br />EXISTINC <br />CON-1-AINMEN-1 <br />SUMP TO REMAIN <br />P1--ASE�__. <br />SCALE:: NTS <br />(1 PER SITE.) <br />-✓ F0 NE_W <br />SER IN T FRNAE._ <br />PIPIN() <br />\LANCE <br />E= LOW <br />SENSOR <br />SHEAR VALVE:. <br />4" Ofd COPPER <br />REMAIN, AVOID <br />2E:TUE�N <br />TANKS <br />Ern.) EY O P O Y i E _) <br />BALANCE=_ PHASE- 11 SYSTEM <br />BILL OF MAI'ERIAI_.S <br />_ _ _ <br />PART DFSC;RIPTION CITY. SPECIFICATION <br />" EDAMF fBl ENDING` MULTI --PRODUCT DISPENSER: 3 --GRACE, 2—SIDED, 1 HOSE PER SIDE, w/ CARL) 4 WAYNE OVATION SERIES MODEL #B---12/3 -0) GASOI_'NE ONI...Y <br />CONVERSION PROCEDUREM <br />'AL.ANCE <br />THEMmCONVERSION' PROCEDURE SHOULD YBE ^CARRIED OUT IN THE ORDER DESCRIBED IN THE PARAGRAPHS THAT <br />FOLLOW. <br />,SOLUTION <br />INMATE BP SAFETY PROCEDURES: 'TAKE ALL PRECAUTIONS NECESSARY TO PROTECT PERSONNEL, FACILITY <br />i <br />�a <br />EMPLOYEES, AND THE GENERAL_ PUBLIC FROM SAFEIFY HAZARDS THAT MAY BE PRODUCED BY VAPOR RECOVERY <br />JEW BALANCE FUEL <br />MODIFICATION ACTIVITIES. <br />{OSE WHIP <br />PRESSUREI TO REDUCE THE VOLUME OF VAPORS THAT h.1AY" BE RELEASED WHEN <br />C4 <br />'THE VAPOR PIPING IS DISCONNECTED AT THE DISPENSER, TEMPORARILY REMOVE THE PRESSURE/VACUUM VENT <br />JEW FUEL_ NOSE BREAKAWAY <br />VALVE. LEAVE THE VENT' VALVE OFF UNTIL THE PROCEDURE IS COMPLETED. IF THERE IS A CONCERN ABOUT <br />BALANCE COAXIAL. WHIP NOSE 5'--0" _- EVER PHASE II <br />PRECIPITATION ENTERING THE OPEN VENT RISER DURING THE DECOMMISSIONING PROCEDURE, A STANDARD <br />(NONPRESSURE/VACUUM) VENT CAP MAY BE TEMPORARILY `f INSTALLED. <br />_ <br />CONNECTOR <br />DECOMMISSIONINGVAC ASSIST VAPOR PUMPS. OPEN THE ELECTRICAL JUNCTION BOX AND DISCONNECT THE WIRING <br />BALANCE BREAKAWAY COUPLING -- DUAL IDOPPETE D - EVER PHASE II <br />AT THE PUMP MOTOR. DISCONNEC"f AND CAP OFF ALC_ WIRES USING APPROPRIATELY" SIZED WIRE NUTS TO ISOLATE <br />NEW DRESSER WAYNE OVATION <br />THE WIRES. CAREFULLY REPLACE THE WIRES IN THE ELECTRICAL JUNCTION BOX FOR TIME MOTOR. REPLACE: THE <br />SEALS ARE IN GOOD CONDITION AND <br />13-12 DISPENSER WITH HIGH <br />ELECTRICAL_ JUNCTION BOX COVER, MAKING SURE THAT ALL GASKET'S AND <br />HOSE RETRACTORS AND CARD <br />PROPERLY POSITIONED, <br />READERS <br />REPROGRAM THE DISPENSER ELECTRONICS AS REQUIRED 'TO DISABLE VAPOR --PUMP MOTOR CONTROL CIRCUITS <br />"1"O <br />MONITORING SENSOR <br />AND TO INDICATE THAT STAGE LI VAPOR RECOVERY IS BALANCE. THIS STEP IS NECESSARY PREVENT ERROR <br />DISPENSERDATA/GRIND/CRED11 CAR[) DISCONNECT <br />CODES AND AVOID DISPENSER MALFUNCTION. CONSULT 'THE DISPENSER MANUFACTURER'S LITERATURE TO <br />DETERMINE HOW TO REPROGRAM THE DISPENSER ELECTRONICS. ONLY PROPERLY TRAINED TECHNICIANS SHOULD <br />REPROGRAM THE DISPENSER ELECTRONICS. <br />DISPENSER INTERCOM DISCONNECT <br />DRAIN LIQUID THAT MAY BE PRESENT IN THE VACUUM PUMP BY TEMPORARILY" DISCONNECTING THE VACUUM <br />10 <br />TUBING AT THE BOTTOM OF THE PUMP. REMOVE ANY GASOLINE REMAINING IN THE PUMP, OR ELSE REMOVE THE <br />PUMP, THERE IS NO NEED 'TO REMOVE THE VACUUM PUMP IF THERE IS NO GASOLINE. LEFT IN IT. <br />2 NP VARIABLE SPEED SUBMERSIBLE TURBINE SUMP <br />REPLACE VAPOR FLOW METER. ACCESS LOW VOLTAGE JUNCTION BOX AND DISCONNECT WIRING TO FLOW METER. <br />NEW NOZZLE (fYP.) <br />REMOVE EXISTING VEEDER—ROOT VAC—ASSIST FLOW METER, AND INSTALL_ NEW VEEDER--,ROOT BALANCE FLOW <br />'THF <br />METER. CONNECT NEW SENSOR WIRING TO EXISTING LOW VOLTAGE JUNCTION BOX: USING SUPPLIED EPO XY <br />NEW NOZZLE SWIVEL_ <br />WIRING KIT. <br />RECONNECT VAPOR PIPING IN THE DISPENSER CABINET. REMOVE HF..ALY BALL VALVE ABOVE; VP1000 PUMP AND <br />INSTALL NEW STRAIGHT PIECE OF COPPER PIPING DIRECTLY FROM MANIFOLD POINT, DOWN INTO NEW <br />NEW BALANCE <br />VEDER--ROOT BALANCE VAPOR FLOW METER, <br />FUEL. HOSE <br />HANGINGREPLACE A BEFORE DISCONNECTING THE STAGE II HANGING HARDWARE FROM 'THE DISPENSER, <br />DRAIN PRODUCT IN THE HANGING HARDWARE INTO AN APPROPRIATE CONTAINER PLACED ON THE GROUND. <br />REPLACE ALL THE STAGE II HANGING HARDWARE WITH BALANCE HANGING HARDWARE PER EXECUTIVE ORDER <br />VR -204. VERIFY THREAD PATTERN FOR EACH DISPENSER AND INSTALL APPROVED ADAPTOR(S) AS NEEDED. <br />REPLACE THE PRESSURE/VACUUM VENT VALVE(S). IF THE EXISTING PRESSURE/VACUUM VENT VALVES ARE NOT <br />HUSKY 5885, INSTALL THE REQUIRED NUMBER OF PRESSURE/ VACUUM VENT VALVES ON THE VENT RISER(S) PER <br />EXECUTIVE ORDER VR -204 <br />CONDUCT REQUIRED CARR 'TESTING PROCEDURES. CONDUCT A ALL REQUIRED 'TESTING PROCEDURES IN <br />IS <br />ACCORDANCE WITH GARB EXECUTIVE ORDER VR_"204 TO VERIFY THAT THE STAGE II VAPOR—RECOVERY SYSTEM <br />TIGHT. NOTE: SEF" CARR EXECUTIVE ORDER VR -204 AND LOCAL AIR PERMIT REQUIREMENTS FOR ADDITIONAL. <br />TESTS/PROCEDURES. <br />VEEDER—ROOT PANEL. REPROGRAM EXISTING VEEIDER—ROOT T'LS-350 MONITORING SYSTEM PANEL TO PERFORM <br />ISD MONITORING OF "BALANCE" STAGE II VAPOR RECOVERY SYSTEM. FOLLOW ALL TESTING PROTOCOLS AND <br />PROCEDURES PER CARIB EXECUTIVE ORDER VR --204. <br />CONDUCT A FINAL VISUAL CHECK. VISUALLY" VERIFY THAT THE STORAGE.: SYSTEM IS IN A CONDITION THAT WILL <br />OF THE STORAGE SYSTEM, <br />RELIABLY PRESENT THE RELEASE OF ANY VAPORS OR LIQUIDS FROM ANY COMPONENT <br />ARE STILL FUNCTIONING. RESTORE THE FACILITY TO OPERATING STATUS, <br />AND THAT ALL. CRITICAL SAFETY DEVICES <br />DISPENSER WITH NEW_ PHASE <br />-- EXISTING VAPOR PRESSURE <br />SENSOR (1 PER SITE=) <br />O O Q <br />I _ <br />HANGING HARDWARE <br />REMOVE COPPER <br />TUBES & FITTINGS <br />p a <br />REMOVE EXISTING VAC <br />___ _ --------- - ASSIST VAPOR FLOW <br />Mf.:_TER SENSOR <br />EXISTING 2 -WAY <br />E=XISTING VAPOR CALIBRATION VALV.. <br />SHEAR VALVE TO REMAIN <br />EXISTING 1/4" OC COPPER <br />TUBING TO REMAIN. 1 " SNORT NIPPLE <br />EXISTING <br />CONTAINMENT- <br />VAPOR RETURN <br />SUMER 1-0 REMAIN ,__.. <br />_ _ <br />___ - BACK TO TANKS <br />F EA mY_ Y Y ASS E - .__I I.. _. <br />`::SCALE: NTS <br />[IIS"TAIE.m_S <br />DYMO DETAIL L -(EXS T NCS <br />EXISTINC <br />CON-1-AINMEN-1 <br />SUMP TO REMAIN <br />P1--ASE�__. <br />SCALE:: NTS <br />(1 PER SITE.) <br />-✓ F0 NE_W <br />SER IN T FRNAE._ <br />PIPIN() <br />\LANCE <br />E= LOW <br />SENSOR <br />SHEAR VALVE:. <br />4" Ofd COPPER <br />REMAIN, AVOID <br />2E:TUE�N <br />TANKS <br />Ern.) EY O P O Y i E _) <br />BALANCE=_ PHASE- 11 SYSTEM <br />BILL OF MAI'ERIAI_.S <br />_ _ _ <br />PART DFSC;RIPTION CITY. SPECIFICATION <br />" EDAMF fBl ENDING` MULTI --PRODUCT DISPENSER: 3 --GRACE, 2—SIDED, 1 HOSE PER SIDE, w/ CARL) 4 WAYNE OVATION SERIES MODEL #B---12/3 -0) GASOI_'NE ONI...Y <br />OVATION I I— <br />READER OPTIONS, CONFIGURED AS REQUIRED FOR SITE SPECIFIC CONDITIONS AND MARKETS. <br />ESS ORDER 6" 'EDESfAL <br />FOR ISLpAND--LF <br />,SOLUTION <br />— -- <br />i <br />�a <br />BALANCE DISPENSER NOLZL_E -- EVR PHASE II -- BLACK <br />SWIVEL_ <br />C4 <br />BALANCE. COAXIAL., NOSE --- 8'--0" — EVER PHASE II <br />� <br />BALANCE COAXIAL. WHIP NOSE 5'--0" _- EVER PHASE II <br />1-1/2" x 18" FLEX <br />_ <br />CONNECTOR <br />6 <br />�- <br />BALANCE BREAKAWAY COUPLING -- DUAL IDOPPETE D - EVER PHASE II <br />UNDER DISPENSER CONTAINMENT <br />SUMP <br />Y7� <br />BALANCE VAPOR F-L.OW METER FOR ISL) <br />SUMP LIQUID <br />___--__-.._---_—.__. _. ... , ____-- __ ._.._------ <br />.MONITORING <br />MONITORING SENSOR <br />8 <br />DISPENSERDATA/GRIND/CRED11 CAR[) DISCONNECT <br />IN HOLDER <br />C 1 <br />DISPENSER INTERCOM DISCONNECT <br />10 <br />CONVERSION FRAME FOR NON __BRAVO UDC <br />Y1) <br />2 NP VARIABLE SPEED SUBMERSIBLE TURBINE SUMP <br />12 <br />SENSOR <br />-- MODEL <br />8 EMCO WHEATON #A4005EVR --052 <br />8 EMCO WHEATON INTEGRAL TO WI -IIP HOSE <br />8 GOODYEAR -- EVER SERIES #5,23236564108031 <br />8 GOODYEAR EVER SERIES #532;36544000600 <br />8 EMCO WHEATON #A4119EVR -020 <br />4 "VEEDER--ROOT" MODEL_ #332374 --XXX (1 PER DISPENSER) <br />1 "POWER INTEGRITY" MODEL._ #[:)DS-_8DM4GEE <br />1 "POWER INTEGRITY" MODEL #DDS.- 81.)234(: <br />4- BRAVO SYSTEMS #CONV—B2000—OPTµ' <br />3 FE PETRO #ISTKR-2. <br />"VEE.DER-- FAGOT" #794-380--208 <br />
The URL can be used to link to this page
Your browser does not support the video tag.