Laserfiche WebLink
{ <br /> 09/11/1995 15:43 12099480755 WOOLSEY OIL INC PACE 02 <br /> f <br /> WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This mortitroring program most be kept at the UST location at all times. The information on this morality ring <br /> program are conditions of the c:peraating `t. lite permit holder must notify Say- Joaquin County <br /> Fnviromoentsl Health Division, phone(,' } 3420 within 30 days 4 any changes to the mor+,utoring <br /> pn�cedures, unlessrd'red to obtain approval before making the change. <br /> Required ley Sections 2632(d) and 2541(h) CCR. <br /> Facility Name WOOLSE'Y OIL CAR.DLOM <br /> Facility Address 1501 West Charter Wa <br /> Y. Stockton CA 95206 <br /> A. Describe the frequency of performing the monitoring: <br /> Tank Monthly ATG usint equipment below at 0.2 wh rate. <br /> (1;Ip <br /> Piping Coantinuous rnonitorin and leak detection. o— - <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monifiw tg: <br /> Tank. __Inc on system TS-1110014 with TSP-LL2 jAuid Level Probe wW standard <br /> float kits for diesel and ;atasoline. Records with printer at 166 Frank West Circle �- <br /> rr�� Piping Incon system'1'S-1QOtl/�wath TSP UL,S Universal Linuid Sensor <br /> ;�in suwp _ <br /> C. Describe the location(s)where the monitoring will be performed(facility plot plan <br /> should be attached): <br /> Attached plat 21an shows location of three 4,,000 gWlon tanks and satellite. <br /> D. List the name(s)mum title(s)of ft people responsible for performing tbae monitoring <br /> and/or maintaining the equipment: <br /> Mike Ffiason Carrtllock Specialist <br /> Jim Lancaster Vl'M>arketinn <br /> Shields!�Mr dt Co Authorized Mainymam Contractor T <br /> H. Reporting format for monitoring: <br /> Tank Daily-alarm.monitoring. 1►+IonW ti�h ,mess report[at lb6 Frank blest Circle <br /> Piping . Dnily alarm monitotrina-Iog Maintained at the site <br /> A Describe the preventive maintenance schedule for the maonaitarring equipment. Nate: <br /> Maintenarrcx must be in accordance with the manufacturer's miunt+enance schedule- <br /> but <br /> chedule <br /> but not less than every 12 months: Annual calibration, Mcision test,cleaning <br /> and vreventaaatiye malntenam as rccoaanmended by the manufacturer <br /> O. Describe the training necessary for the operation of UST system,including piping, <br /> and the monitoring equipment: On site training by manufac resentative <br /> at system checkout and startup <br />