Laserfiche WebLink
WRI'I'T X MONITORING PROCEDURES JUN 2 3 1995 <br /> UNDERGROUND STORAGE TANK MONnORING PRO <br /> This monitoring program must be kept at the VST location at su tittles. The Information OttL HEALTH <br /> program are conditions of the operating permit. 'The permit holden trust notify Salt Joaqui ERV(CES <br /> Environmental Health Division,phone (209) 468-3420 within 30 days of inn Changes to the monitoring <br /> procedures, unless required to obtain approval before matting the change. <br /> Required by Sections 2632(d) and 2641(h) CM <br /> Facility Name WoolsOil Carsllook <br /> Facility Address 1501 West Charter Way, Stockton, CA 95206 <br /> A. Describe the frequency of performing the monitoring: <br /> Tank Daily Stirkng Anel mat-Pr rr rnnri l cationYearly <br /> i nteari t` y test <br /> Piping Continuuus monitoring and leak detection. <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank l,janttal risi lx, rsmrrnnri 1 iatinn <br /> e <br /> Piping INCON system TS 1000 with TSP-ULS Universal Liquid _ <br /> C. Describe the locations) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> Daily inventory reconciliation by manual _Qi -king at Parh <br /> of three existing tanks . Liquid senosor in sump at sate-IJ-ite. <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> Mike Fliason , C'ardlook Spior•ialisiL <br /> aim T ancaster. 1112 Marketing - <br /> E. Reporting format for monitoring: <br /> Tank County Inven 'liation Fermat <br /> Piping Daily Log at site detailing Equipment Status an _.&j, rms <br /> F. Describe the preventive maintenance schedule for the monitoring equipment Note: <br /> Maintenance mast be in accordance with the manufacturers' maintenance schedule <br /> but not less than everr_vl2months* Yearly cleaning and checkout. ag <br /> required by INCON Intelligent Controls , _Inc. <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment On-site training by installer and <br /> Manufacturer representative at system checkout and 9ta ±ut <br />