My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1501
>
2300 - Underground Storage Tank Program
>
PR0231989
>
COMPLIANCE INFO_1987-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2022 4:24:09 PM
Creation date
6/23/2020 6:54:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1998
RECORD_ID
PR0231989
PE
2361
FACILITY_ID
FA0003976
FACILITY_NAME
VALLEY PACIFIC CHARTER WAY CARDLOCK
STREET_NUMBER
1501
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337016
CURRENT_STATUS
01
SITE_LOCATION
1501 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231989_1501 W CHARTER_1987-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lyn# <br />r - - TS4000 Features <br />When all is said and done, any ATG <br />is measured by its ability to perform <br />volumetric leak tests. With its <br />probability of detection P(D) of <br />better than 99.5% and probability of <br />false alarm P(FA) of less than 0.5%, <br />the Tank SentinelTm has established <br />itself at the front of the pack. It not <br />only exceeds the EPA regulations, <br />but also state and local require- <br />ments throughout North America. <br />And, if your application calls for <br />interstitial liquid monitoring in <br />double-wall tanks, or for liquid <br />sensing in sumps or double-wall <br />piping, the system is equipped to <br />handle the job. With the Tank <br />SentinelTN1, you can be certain that <br />you will meet your leak detection <br />requirements, wherever the site may <br />be located. <br />If you want a top quality automatic <br />tank gauge, you have a choice. You <br />can spend a lot of money on one of <br />those old-fashioned ATG's, or you <br />can spend a lot less on an INCON <br />TS -1000. The highest accuracy, the <br />most information, the best technol- <br />ogy, and the lowest price. The <br />choice IS clear. Call INCON, toll- <br />free, 1-800-833-8328, for more <br />information or the name of a dis- <br />tributor near you. <br />r -, <br />• Programmable alarms -- high level, low level, high -high level, <br />low -low level, high water, theft, leak, system errors <br />• Records alarms and delivery history in journal buffer <br />• Programmable schedule for reports and leak tests <br />• Alarm relay contact output and built-in audible alarm <br />• Optional integral printer <br />• Automatic detection and recording of deliveries <br />• Automatic theft detection <br />• 46 pre-oroarammed standard tank tables <br />• Volumetric leak detection -- P(D) = 99.5% @ 0.1 gal/hour <br />• One system monitors 2 or 4 tanks <br />• Advanced RS -232 communications <br />• True volumetric temperature compensating to API or custom tables <br />• Full remote PC-based console capability <br />oo Handles manifolded tanks <br />• Standard liquid monitoring capability in interstitial spaces, sumps, etc. <br />• Advanced smart tank <br />• Compatible with almost any liquid <br />• Programmable alarm setup can tie any combination of alarms to output <br />relays or audible alarm <br />• Four number auto -dialer can call different numbers when alarms, <br />deliveries or leaks occur <br />• Inventory report (printed on demand or scheduled) <br />• Reconciliation Report (printed on demand or scheduled) <br />• Delivery Report (printed after each delivery) <br />• Delivery History (printed on demand or scheduled) <br />• Leak Test Report (printed at test completion) <br />• Leak Test Time Estimate Report (printed on demand) <br />• Alarm Report (printed when alarm condition detected) <br />• Alarm History (printed on demand or scheduled) <br />• Alarm Status and Configuration Report (printed on demand or scheduled) <br />• System Configuration Report (printed on demand or scheduled) <br />• Tank Configuration Report (printed on demand) <br />t <br />
The URL can be used to link to this page
Your browser does not support the video tag.