Laserfiche WebLink
1 <br /> DECONTAMINATION MEASURES <br /> At the end of each work day, all JCC ' personnel will thoroughly <br /> wash their hands, face and footwear before leaving the site, In <br /> the event that personal protective equipment is necessary, all <br /> disposable items will be deposited into a steel drum container on <br /> site and all reusable items will be washed with soap and water and <br /> rinsed with clean water, Residual liquid will be placed in a steel <br /> drum container on site. Personnel will not be allowed to leave the <br /> contaminated area without completing the decontamination process, <br /> GENERAL SAFE WORK PRACTICES <br /> All personnel will be alert for trucks and other vehicles entering <br /> and leaving the site, <br /> Others: <br /> MEDICAL CONTINGENCY PLAN 60Q) <br /> Hospital/clinics z ssz tAA(> ,,M Phone: : CV4--?, - )-000 <br /> Hospital Address: t J -(t �7' "r <br /> Paramedic/Fire Dept/Police Dept: 911 <br /> Any personnel at the site who are injured must notify the Site <br /> Safety Officer, Paramedics can be atthesite location within 10 <br /> minutes for extreme emergenciesa if any chemical exposures are <br /> exceeded, a medical exam will be required4 <br /> Site Hazard IpformatJon Provided By. <br /> Signature: <br /> Phone Number: S 7-0 8 )6 --( � 3( Date: <br />