Laserfiche WebLink
17 <br />ffRCB, January 2002 Page 2— of <br />7. UNDER -DISPENSER CONTAINMENT DC TESTING <br />Test Method Developed By: 0 UDC Manufacturer ,industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ;�*Iydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: 7A C U^ S'S Equipment Resolution: • o <br />UDC # 1, UDC # t 1` UDC # UDC # <br />UDC Manufacturer: <br />UDC Material: <br />UDC Depth: <br />Height from UDC Bottom to Top p p <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testin <br />Portion of UDC Tested <br />Does turbine shut down when <br />UDC sensor detects liquid (both Yves ❑ No ❑ NA .ECYes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />product and water)? <br />Turbine shutdown response time <br />Is system programmed for fail- <br />kYe Yes ❑ No ❑ NA s ❑No ❑ ❑No DNA ❑Yes ❑ No ❑ NA <br />safe sudown?* <br />0 Yes <br />Was fail-safe verified to be WYes ❑ No ❑ NA 'Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />o erational?* <br />Wait time between applying <br />pressure/vacuum/water and j S %yt �i+ J �'�jp► �t� <br />starting test / <br />Test Start Time: ; 12 ; 3; f z • 2 <br />Initial Reading (RI): .'�69 76 !* s� I • �� <br />Test End Time: <br />Final Reading (RF): Ice G ,/, z z <br />Test Duration: ,% / ".in i .1L+ ! S•u;� <br />Change in Reading (RF -RI): <br />—, ao _ , 0,2- <br />&,. 47- <br />Pass/Fail Threshold or Criteria: <br />.», ®o L . v®'a- <br />- : vo t . o v 2 <br />Test Result: <br />ass ❑ Fail <br />O_Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />❑ Ves ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No [INA <br />Was sensor properly replaced and <br />verified functional after testing? <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />