Laserfiche WebLink
.,8, January 2002 <br />Page f- of <br />DTDTN!_ CT TMP TF 4QTTNf _ <br />V• 8 EE E <br />fest Method Developed By: ❑ Sump Manufacturer "industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ;4iydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: rt Cv,, _ S T5 <br />Equipment Resolution:�?�. <br />w� ��� <br />Sump # <br />Sum # <br />P <br />Su, np # <br />Sump # <br />Sump Diameter: <br />Z <br />Sump Depth: <br />i <br />Sump Material: <br />j' <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />v1 <br />' �t <br />Height from Tank Top to LowestrG <br />Electrical Penetration: <br />J ® <br />j <br />f7 <br />Condition of sump prior to testing: <br />&7",a CX <br />e <br />Portion of Sump Tested` <br />z <br />tom^ z <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />A --Yes ❑ No ❑ NA <br />�'es EI No ❑ NA <br />❑Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?. <br />Yes ❑ No El NA <br />�1 Yes El No ❑ NA <br />❑Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />® <br />eronal? <br />ati <br />I,�' es ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />o <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />Test Start Time: <br />�V� + n ^ <br />Initial Reading (Rj): <br />Test End Time: <br />14, 0q q. p 2q <br />7, ® <br />(�'Q <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Ri): <br />04 U-02-1 <br />•) ( <br />M <br />ovf e ^'A <br />I51m'l <br />i cM��°� <br />:8- <br />i > 001 <br />-$ <br />Pass/Fail Threshold or Criteria: <br />OD Z - Zx' ,2.' <br />a . oD - <br />Test Result: <br />N Pass ❑ Fail <br />Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑Pass ED] Fail <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testing? <br />Yes ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ED No ED NA <br />Yes ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />[]Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Comments — <br />on repairs,made prior to <br />and recommended_ <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />