Laserfiche WebLink
ONI RING SYSTEM CERTIFIOATION <br />For Use By All Jurisdictions Within the State of California <br />Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations <br />This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be <br />prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided <br />to the tank system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems <br />within 30 days of test date. <br />A. General Information <br />Facility Name: <br />Site Address: <br />Facility Contact Person: <br />SOUTH BAY TIRE <br />1501 W. CHARTER WAY <br />STOCKTON, CA 95206 <br />Contact Phone No.: <br />Bldg. No.: <br />_ Zip: - <br />Make/Model of Monitoring System: `� �Q�1� %,ad.C1J Date of Testing/Servicing: (V,, <br />B. Inventory of Equipment Tested/Certified <br />Check the appropriate boxes to indicate specific equipment inspected/serviced: <br />Tank ID: <br />Tank ID: <br />In -Tank Gauging Probe. <br />Model: <br />❑ In -Tank Gauging Probe. <br />Model: <br />Annular Space or Vault Sensor. <br />Model: t a <br />❑ Annular Space or Vault Sensor. <br />Model: <br />Piping Sump / Trench Sensor(s). <br />Model: a, <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). <br />& Mechanical Line Leak Detector. <br />Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />Model: <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />0 Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model:. <br />❑ Other �specity equipment e and model 4f Section E on Pa e 2). <br />❑ Others eci a ui ent e and <br />model in Section E on PHS 2L <br />Tank ID: t <br />.. <br />Tank ID: <br />In -Tank Gauging Probe. <br />Model: -C <br />❑ In -Tank Gauging Probe. <br />Model: <br />Annular Space or Vault Sensor. <br />Model: _t� _ <br />❑ Annular Space or Vault Sensor. <br />Model: <br />Piping Sump / Trench Sensor(s). <br />Model: r 0 <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). <br />Model: 0 <br />❑ Fill Sump Sensor(s). <br />Model: <br />® Mechanical Line Leak Detector. <br />Model: -i.:' <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />iQ• Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Other (specia Nuipment!X2S=andd model in Section E on Pa e 2 . <br />❑ Others eci a ui ment e and model in Section E on Pae 2). <br />Dispenser ID: <br />Dispenser ID: — <br />7--,"-- <br />U Dispenser Containment Sensor(s). <br />Model: <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />Shear Valve(s), <br />Dispenser Containment <br />(P Shear Valve(s). <br />Floats and <br />Chain(s). <br />TJ Dispenser Containment Floats and <br />Chains . <br />Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />RE Shear Valve(s). <br />41 Shear Valve(s). <br />-Dispenser Containment Flo2�ts2 and Chains . <br />Di enser Containment Floats and Chain(s). <br />Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />Shear Valve(s). <br />El Shear Valve(s). <br />Dis enser Containment Floats and Chain(s). <br />❑ Dis enser Containment Floats and Chains . <br />li the taciiity contains more tanks or dispensers, copy this tbrm. Include information for every tank and dispenser at the facility. <br />C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the <br />manufacturers' guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this <br />information is correct and a Plot Plan showing the layout of monitoring equipment. For any a 'pment capable of generating such <br />reports, I have also attac e a copy f he report- (check all that apply): ❑ Sya et -up I Alarm his ory report <br />Technician Name (print): CJ�j k (d`•n�-= _ Signature: <br />Certification No.; License, No,; <br />Testing Company Name: TANK-TEK ENVIRONMENTAL CORPORATION <br />Site Address: 115Q V1 . CV�ar <br />Phone No.: (707) 446--6151 <br />Date of Testing/Servicing: I()/, � __0 <br />Page 1 of 3 03/01 <br />Monitoring System Certification <br />