Laserfiche WebLink
UNIMD PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONJITORING FLAN- 1 of2j <br /> TYPE OF ACTION ❑1.NEW PLAN 2.CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Ch one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYS <br /> FACILITY #(Agency Use(may) <br /> BUSINESS N E(Same as FACILITY NAME)Valley PaGft Petroleum Cardtock-Charter Way 3 <br /> BUSINESS SITE A KESS 15111 W.C er y 103 CITY St on ,a. <br /> Testing,preventive mainterloce,and calibration of monitoring equipment(e.g.,sensors,probes,line leak dateetorsAft.)must be performed at the frequency <br /> specified by the equipment facturars'instructions,or annually,whichever is more firequent and that suchwo must be performed by qualified personnel. <br /> 23 CCR'2632.2634 2638 2 <br /> MONITORING EQUIPMENT I ERVICED M 1.ANNUALLY ❑ 99. HER( � �)� 490.3S(Specify): 490-3kIb <br /> 6 <br /> MiREW SITE PLOT PLANIMAP 804"WITHTHIS PLAN. M2.SIT9PLOTPI, 00MAPPREVIOUSLYSUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> I.CONTINUOUS ELECTRONIC T ��.j <br /> OF ANN )SPACE(S)OR SECONDARY CONTAINMENT 490.5 <br /> VAULT(S)WITH AUDIBLE AND VTSU (23 CCR§2632,2634)SECONDARY CONT IS: b.LIQUID FILLED c.PRESSURIZED490.6 <br /> ❑d.UNDER VACUUM <br /> PANEL MANUFACTURER: {� 490.7' _MODEL#' gII �- ----- 4"-E <br /> LEAK SENSOR MANUFACTURER.- r 491-9' MODEL 3):420 490-10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM U TO MONTTSIN, ' W TANKtS1 (23 CCR§2W) 490-11 <br /> PANEL MANUFACTURER: 490.12. MODEL#: 490.13 <br /> IN-TANK PROBE ACTURER: 490.14. MODEL#(S): 490.1 <br /> LEAK TEST FREQUENCY`. ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490616 <br /> ----------------------- -® d_MONTHLY-- -- ------®e.OTHER(S eci +): ---- 490-17 <br /> PROGRAMMED TESTS: 490.18 <br /> ❑ a.0.I g.p.h. b.0.2 g. h. ❑ c.OTHER(Specify): <br /> 490.19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCI N(23 CN§2646.1): 490.20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING'(MTG)(23 Co§2645). TING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> 490-22 <br /> S.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BI TALLY ❑ c.O Specify): 490-24 <br /> ' 490-25 <br /> ❑99.OTHER (Specify): 493-26 <br /> to - 49147 <br /> 2�v <br /> 1.CONTINUOUS MONITORING OFG'S AND SECONVAR CONTAINMENT AUDIBLE AND 491-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENTIS:❑0. D ❑b.LIQUID FILLED ❑c.PRESSURIZED d.UNDER VACUUM _ 490-29 <br /> PANEL MANUFACTURER: 490-30 DEL#: -� 490•31 <br /> LEAK SENSOR MANUFACTURER: 490.32 MODEL s): 208 490-33 <br /> PIPING LEAK ALARM TRIGGERS OMATIG PUMP(i.e.,TURBINE)SHUTDOWN. a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP S a.YES [3 b.NO 493.35 <br /> 2.MEJCHANICAL LINE LEAK TECTOR(MLLD)THAT ROUTINELY PERFORMS3.0 g LEAK TS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A AK I&DETECTED 23 CCR 490-36 <br /> MLLD MANUFA S): FE Petro 490-37 MODEL#(S). P-h1LD 490-38 <br /> ❑ 3.ELECTRONIC LINE LEA DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g p h.LEAK TESTS_ CCR§2636) 490-39_ <br /> ELLD MANUFACTU S) -440' MODEL#(S): 491-41 <br /> PROGRAMMED IN L LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL g.p.h. ------- 49042 <br /> ELLD DETECTION F A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES b.NO 490 43 <br /> ELLD FAILUR SCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES b.NO 4904A <br /> 4.PIPE INTEGR TESTING 490-45 <br /> TEST FRE CY 0 a.ANNUALLY b.EVERY 3 YEARS Q c.OTHERS eci 4.4. <br /> 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUEkjCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" 49049 <br /> Allowed for of wburied r.ftw mma only eu HSC 25281.5 3 - <br /> ❑ 6.SUCTION PIPING MEETS=EXEMPTION CRITERIA 123 CCR§ a)(3)j. 490s0 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYS <br /> 490-51 <br /> ❑ 99.OTHER(Specify) 490-52490.53 <br /> UPCF UST-D(12/2007)1/4 <br />