My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1501
>
2300 - Underground Storage Tank Program
>
PR0231989
>
COMPLIANCE INFO_2008-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 8:46:42 AM
Creation date
6/23/2020 6:54:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2016
RECORD_ID
PR0231989
PE
2361
FACILITY_ID
FA0003976
FACILITY_NAME
VALLEY PACIFIC CHARTER WAY CARDLOCK
STREET_NUMBER
1501
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337016
CURRENT_STATUS
01
SITE_LOCATION
1501 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231989_1501 W CHARTER_2008-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST Monitoring Plan-Page 2 Instructions <br /> Complete a separate UST Monitoring Plan for each UST monitoring system at the facility. This form must be submitted with your initial UST <br /> Operating Permit Application and within 30 days of changes in the information it contains. Please note that your local agency may require you to <br /> obtain approval poor to installing or modifying monitoring equipment. (Note: Numbering of these instructions follows the data element numbers on <br /> the form.) <br /> 490-54a.MONITORING OF THE UNDER DISPENSER CONTAINMENT-Indicate the method used for UDC monitoring. <br /> 490-54b.SPECIFY-If 99"Other"is checked,describe other method used. <br /> If VI-1-1,VI-1-2 or VI-1-3 or VI-1-99 is checked,complete 490-55 to 490-64b. <br /> 490-55, PANEL MANUFACTURER-Enter the name of the manufacturer of the monitoring system control panel(console). If there is no control panel(e.g.,only an electrical <br /> relay box is installed)leave this space blank. <br /> 490-56. MODEL#- Enter the model number for the monitoring system control panel(console).If there is no control panel(e.g.,only an electrical relay box is installed)leave <br /> this <br /> space blank. <br /> 490-57. LEAK SENSOR MANUFACTURER-Enter the name of the manufacturer of the sensor(s). <br /> 490-58. MODEL#(S)-Enter the model number of the sensor(s)installed if additional space is seeded,use Section X. <br /> 490-59. DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL.ALARMS.Indicate Yes or No <br /> 490-60. UDC LEAK ALARM TRIGGERS PUMP SHUTDOWN-Indicate Yes or No <br /> 490.61. FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN-Indicate Yes or No <br /> 490-62. UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER-Indicate Yes or No. <br /> 490.63. UDC CONSTRUCTION-Indicate if the construction of the UDC is single-walled,or double-waited. <br /> 490-64a.DOUBLE-WALLED INTERSTITIAL,SPACE MONITORING-Indicate what is used to monitor the interstitial space. <br /> 490-64b.LEAK WITHIN THE SECONDARY CONTAIMENT OF U13C TRIGGERS AUDIBLE AND VISUAL ALARMS-IsMdicate Yes or No <br /> 490-65. VII-1 ELL)TESTING-Check the box if you leve been notified by the State Wates Resources Control Board(SWRCB)that the UST(s)covered by this plan is/are <br /> subject to Enhanced Leak Detection Require (i.e.,UST has any single-wall comment and is located within 1,000 feet of a public drinking water well). <br /> 490-66. TESTING OF SECONDARY CONTAINMENT COMPONENTS EVERY 36 MONTHS Check the box if you have secondary containment that requires testing. <br /> 490-67. SPILL BUCKET TESTING-Check the box if you have spin buckets. <br /> 490-68a-h:VIII RECORDKfiEPING-Indicate which monitoring and equipment maintenance records are maintained for this facility. <br /> 490-69a IX TRAINING STATEMENT Check the box to verify that the statement is true. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY-Check the appropriate boxes to describe reference documents maintained at the facility. Note that the <br /> first two items on the list M=be kept at the facility. <br /> 490-69b. MONITORING PLAN:Indicate that this plan is kept as a reference document. <br /> 490-69c. OPERATING MANUALS FOR ELECTRONIC EQUIPMENT:Indicate that this pian is kept as a reference document <br /> 490-69d. CA UST REGULATIONS-Indicate thsatdds is kept as a reference document. <br /> 490-69e. CA UST LAW-Indicate that this is keptas a reference document <br /> 490-69C STATE WATER RESOURCES CONTROL BOARD(SWRCB)PUBLICATION- "HANDBOOK FOR TANK OWNERS-MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION-Indicate that this is kept as a reference document. <br /> 490-69g.SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS":Indicate that this is kept as a reference document. <br /> 490-69h.OTHER-Iodinate that other reference documents are kept. <br /> 490-69i. SPECIFY-If"OTHER"is checked,enter a brief description of the other document(s)maintained at the facility.If additional space is needed,see Section X. <br /> 490-70. DESIGNATED OPERATOR TRAINING-Check this box to verify that this statement is true. <br /> 490-71. COMMENTS/ADDITIONAL INFORMATION-Make additional comments or you may aftwh and identify the number of additional pages of information to describe <br /> any additional UST system monitoring-related information(e.g.,additional information required by your local agency). Attach any monitoring logs that you will be using <br /> for the monitoring of your tank system. <br /> 490-72. NAME-Enter the name of the person who routinely conducts the monitoring and equipment maintenance under this plan. <br /> 490-73. TITLE-Enter the title of the person. <br /> 490-74. NAME-Enter the name of the second person,if applicable,who routinely conducts the monitoring and equipment maintenance under this plan. <br /> 490-75. TITLE-Enter the fide of the second person. <br /> OWNERIOPERATOR SIGNATURE-The tank owner/operator,facility owner/operator,or an authorized representative of the owner shall sign in the space provided. <br /> This signature certifies that the signer believes that all information submitted is true,accurate,and complete,and that the training program specified in Section IX has <br /> been implemented. <br /> 490-76. REPRESENTING-Check the appropriate box to indicate whether the signer is the UST owner/operator,the UST facility owner/operator,or an <br /> authorized representative of the owner. <br /> 490-77. DATE-Enter the date the plan was signed. <br /> 490-78. APPLICANT NAME-Print or type the name of the person signing the plan. <br /> 490-79. APPLICANT TITLE-Enter the title of the person signing the plan. <br /> UPCF UST-D(12/2007)4/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.