Laserfiche WebLink
Ll <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES [ ] NO M <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for <br />each person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health <br />and Safety Plan' is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram <br />drawn to scale showing location of repairs and/or replacements. If repairing a component, describe how this will <br />be done. (if agginq piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST <br />Installation Application pages 4-8 as necessary for a timely plan review): <br />Power outage caused Veeder Root TLS -350 to stick in arm Start" mode. The technician checked the <br />system and was able to restore the system with a cold start. We are monitoring the site determine if the <br />problem will reoccur. If it happens again we will need to replace the CPU board and cold start the system <br />again. (The system shutdown worked and the site is unusable when the monitor is down.) <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />We will need to replace the CPU board (VR ®art M <br />