Laserfiche WebLink
Monitoring System Certification <br />UST Monitoring Site Plan <br />Site Address: 1601 W, CHARTER WAY, STOCKTON, CA 95206 <br />...... .......... .. <br />. . . . . . . 87. . . D.ISL. . . <br />...... .......... .. <br />. . . . . . . . . . .(tT). <br />................... <br />................... <br />..................................................... <br />....................................... <br />.......................................I <br />..................................................... <br />................ <br />. . . . . . . . . . VAPOR <br />.......... <br />. <br />................................. <br />ANNULAR <br />I....................... <br />A� . <br />.............. <br />............. <br />® <br />PIPING <br />. . . . . . . . . . . . FII -L. <br />OF . . <br />. . .TURBINE <br />�'/ . . <br />. .MONITOR . <br />. . . VERT. <br />. . <br />. 0 . . . <br />. . . <br />. . . . ATO. <br />Date map was drawn: 03/ 12/ 10 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On <br />your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control <br />panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line <br />leak detectors; and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification <br />Page 4 of 4 <br />1 <br />12/07 <br />2/21/07 <br />