Laserfiche WebLink
Monitoring System Certification <br />UST Monitoring Site Plan <br />Site Address: 1501 W. CHARTER WAY STOCKTON CA 95206 <br />..................................................... <br />..................................................... <br />..................................................... <br />. . . . . . . . . . . . . . . <br />..................................................... <br />..................................................I.. <br />..................................................... <br />..................................................... <br />..................................................... <br />VAPOR, <br />. . . . <br />, lL, <br />. . . . . . . . <br />,A�INUI�gR, <br />. . . . <br />, �, <br />. . . . . . . <br />,MONITOR, <br />. . . . . <br />. , <br />. . . . . . . <br />PIPING <br />. . I <br />• . . . . . . . . . . . FILL. <br />. ®. . . <br />. . TURBINE. <br />.LTJ` . <br />. . . . VENT. <br />0. . . <br />. , , <br />. . . . ATG . <br />Date map was drawn: 03/ 13/09. <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On <br />your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control <br />panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line <br />leak detectors; and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification <br />Page 4 of 4 <br />12/07 <br />1 2/21/07 <br />