Laserfiche WebLink
For Use By All Jurisdictions Within the State of California <br />Authority Cited: Chapter 6.7, Health and Safety Code, Chapter 16, Division 3, Title 23, California Code of Regulations <br />This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be <br />prepared for each monitoring_system control panel by the technician who performs the work. A copy of this form must be provided to <br />the tank system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems <br />within 30 days of test date. <br />A. General Information <br />Signature: <br />Facility Name: SOUTH BAY TIRE <br />Bldg. No.: <br />Site Address: 1501 W. CHARTER WAY <br />City: STOCKTON I Zip: 95206 <br />Facility Contact Person: MIKE ELIASON <br />Contact Phone No.: (209) 948-9412 <br />Make/Model of Monitoring System: INCON TS1000 <br />I Date of Testing/Servicing: JUN 5, 2008 <br />B. Inventory of Equipment Tested/Certified <br />Signature: <br />Check the aggropriate boxes to indicates ecific a ui ment inspected/serviced: <br />Tank ID: 87 <br />Tank ID: <br />Z In -Tank Gauging Probe. Model: MAG <br />❑ In -Tank Gauging Probe. Model: <br />® Annular Space or Vault Sensor. Model: FLOAT <br />❑ Annular Space or Vault Sensor. Model: <br />Piping Sump / Trench Sensor(s). Model: FLOAT <br />❑ Piping Sump / Trench Sensor(s). Model: <br />❑ Fill Sump Sensor(s). Model: <br />❑ Fill Sump Sensor(s). Model: <br />Z Mechanical Line Leak Detector. Model: STP -MLD <br />❑ Mechanical Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. Model: <br />® Tank Overfill / High -Level Sensor. Model: FLOAT <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Others eci a ui ment ty2e and model in Section E on Pae 2). <br />❑ Others eci equipment a and model in Section E on Page 2). <br />Tank ID: DIESEL <br />Tank ID: <br />Z In -Tank Gauging Probe. Model: MAG <br />❑ In -Tank Gauging Probe. Model: <br />® Annular Space or Vault Sensor. Model: FLOAT <br />❑ Annular Space or Vault Sensor. Model: <br />® Piping Sump / Trench Sensor(s). Model: FLOAT <br />❑ Piping Sump / Trench Sensor(s). Model: <br />❑ Fill Sump Sensor(s). Model: <br />❑ Fill Sump Sensor(s). Model: <br />® Mechanical Line Leak Detector. Model: STP -MLD <br />❑ Mechanical Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. Model: <br />® Tank Overfill / High -Level Sensor. Model: FLOAT <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Others eci a ui ment a and model in Section E on Pa e 2 . <br />❑ Other (s2ecify a ui ment =e and model in Section E on Page 2). <br />Dispenser ID: 1-2 <br />Dispenser ID: 66=7 <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Dispenser Containment Sensor(s). Model: <br />Z Shear Valve(s). <br />® Shear Valve(s). <br />Z Dis enser Containment Floats and Chain(s). <br />® Dispenser Containment Floats and Chains . <br />Dispenser ID: 334 <br />Dispenser ID: 7A <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Dispenser Containment Sensor(s). Model: <br />Z Shear Valve(s). <br />® Shear Valve(s). <br />Z Dispenser Containment Floats and Chains . <br />Z Dis enser Containment Floats and Chains . <br />Dispenser ID: 5 - 6A <br />Dispenser ID: <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Dispenser Containment Sensor(s). Model: <br />Z Shear Valve(s). <br />❑ Shear Valve(s). <br />Z Dis enser Containment Floats and Chain(s). <br />❑ Dis enser Containment Floats and Chains . <br />*If the facility contains more tanks or dispensers, copy this form. Include <br />information for every tank and dispenser at the facility. <br />C. Certification - I certify that the equipment identified in this <br />document was inspected/serviced in accordance with the manufacturers' <br />guidelines. Attached to the Certification is information (e.g. manufacturers' <br />checklists) necessary to verify that this information is correct and a <br />Plot Plan showing the layout of monitoring equipment. For any equipment <br />capable of generating such reports, I have also attached a copy of the <br />report; (check all that apply): Z System set-up <br />❑ Alarm history report <br />Technician Name (print): ROBERT NEIMEYER7 <br />Signature: <br />Certification No: 3647353760 <br />1 License: 803705 <br />Testing Com anName: TANK-TEK ENVIRONMENTAL CORPORATION <br />I Phone No: (707) 446-6151 <br />Address: 607 ELMIRA RD, PMB 336, VACAVILLE, CA 95687 <br />Date of Testing/Servicing: <br />JUN 5, 2008 <br />Page 1 of 3 <br />Monitoring System Certification <br />