Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> z _ <br /> ,. � i <br /> I. UDC MONITORING 15 PERF6 D USING THE FOLLOWING METHOD ., . � �; 490-546 <br /> ✓ ❑ 1 CONTINUOUS ELECTRONIC MONITORING ®2.FLOAT AND CHAIN ASSEMBLY 0 3.ELECTRONIC STAND-ALONE 490.54b <br /> ❑4:NO DISPENSERS ❑99-OTHER(Specify)'-- -- <br /> -- ---—-----— -- <br /> -- — — — - - <br /> 490 ss — <br /> PANEL MANUFACTURER:Bravo MODEL# 490-56" <br /> — <br /> -------- <br /> LEAKSENSOR MANUFACTURER: 494-s t + MODEL#(#(S) --—----- — -- — 490.58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a:YES N b NO <br /> 446:3T- <br /> UDC <br /> 90 59UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN490-CO.❑ a.YES ®b.NO 490-b <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES [b.NO ¢Q0'bi <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION 19 Gal-SINGLE-WALLED 02.DOUBLE-WALLED 49063 <br /> IF DOUBLE,WALLEDaoOTa� <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: 1.LIQE1Id_ 2:PRESSURE 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES O b.NO 4w"5 <br /> !. E1 D TESTING:THIS FACiLI: HAS BEEN NOTIItIEft BY Ti1E STATE.WATER RESOURCES CONTROL BOARD THAT RHH4KED 494 65 <br /> MUST BE NERFORMED.`PERIODIC ELI?IS PI:RPt?RMRi}EVERY 36 MONTHS AS Rl(%IREDCCR_ 644�__—_ <br /> �(2.iECONPAax TAIN NT'COMP()k FLATS ARE TES PED EVERY 36 MONrHs. 490-66 <br /> ---- - -- - ----------------- <br /> -3 ---- <br /> SPlLI gIUCKETS ARE Ii ANNUAELY4.67 <br /> TIS following monitorinprfmaintenance records are kept for this facility_ <br /> Alarm logs 490 vs. { trtsnal fnsppction Records 490-686 ❑Tank integrity testing results 4vo-sac <br /> ❑SI[t testing results(and sup` documentation records). 490-Od ❑ Tank gauging results(and supporting documentation records). 490.68e <br /> ❑ATG Testing regalis(and supporting documentation records).490.68r ❑ Corrosion Protection 60-day logs a90.6sa <br /> ` Equipment maintenance arid calibration records. 49"ah <br /> ❑Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-698 <br /> REFERENCE DOCUME14TS,MAINTAINED AT FAIGILITX(Check all that apply) <br /> THIS , ERGROUk S"rOl RAAGE, TANK MONITORING PLAN(Required)49o.69b <br /> >OPERATING It4ANUALS POR ELECTRONIC MONITORING EQUIPMENT(Required)490.w <br /> y CALIFORNIA UNDERGRO01411STORAGE TANK REGULATIONS 49o.49d <br /> ❑ CALIFORNIA UNDWROEIN6 STORAGE TANK LAW 490.69. <br /> ❑ STATE WATER RESOURCES;CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY,RECONCILIATION"490-W <br /> ❑ SWRCS PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"49a.49s <br /> ❑ OTHER(Specify):ice;miioj <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council—(ICC)---- <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but isnot limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> The facility employee's rote withtogard to the monitoring equipment as specifiedin UST Monitoring Plan <br /> A The facility employee's role with regard to spills and ovaifiils as specified in the UST Response Pian <br /> Nantes of contact persons)for JOuctgcncics and rannitorml;alarms.490-7o <br /> Provide additional comments <br /> hotel or i ,to how many,pages with odditionalinformation on speci to ikormg•pracedu�rpes�are attached-to this plan,a9a7t > <br /> OeatoiiloreVarmOn d g##�With n4ch ai'ft r S4@ a1l$ fe. A le-G6 <br /> �t Act aP;-sF+C <br /> aowle Wit -f Fva <br /> The UST Owner/Opemicir is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained property. <br /> The faillowi personal are responsible for performing the monitoring and equipment maintenance: <br /> NAME 49o-7z TITLEk r 490-73 <br /> NAME 49o.74 TITLE } 490-75 I <br /> The Desfgioatedd 1001M ttr.shall:perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> CEII.TIFICATION:I certify haf the inLot ion providedhemin is true and accwat to the best of my knowledge. <br /> APPLICANT SIGNATU 490.76 DATE: 490-77 <br /> 311112009 <br /> i <br /> ICANTNAME(print}: '73 APPLICANT TITLE: 490-79 <br /> Mike Ef a . Cardlock Manager <br /> UPCF UST-0(12/2007)3/4 <br />