Laserfiche WebLink
0 9 <br /> Mr. Don Mukai -2- January 23, 2013 <br /> Bravo, since dimensions of the new dispenser and the existing UDC determine the size <br /> and angle of the sloped weirs. <br /> Review Process of the CONV-132000 <br /> Pursuant to California Code of Regulations (CCR), Title 23, § 2636(g)(3), we have <br /> reviewed the application to determine whether the system adequately protects the soil <br /> and beneficial uses of groundwater. During the review process the State Water Board <br /> received and reviewed the following documents: Dispenser Conversion Frame, Model <br /> CONY-B2000 product literature; State Registered Professional Engineer Approval letter; <br /> Conversion Frame Specifications; and Bravo Conversion Frame Installation/Inspection <br /> Manual. A California registered Professional Engineer has reviewed the Bravo catalog <br /> sheet with specifications and the B2000 Conversion Frame Installation Instructions and <br /> has concluded that the frame is acceptable for adapting an existing installed UDC to a <br /> new dispenser (See Enclosure 2). <br /> Conditions of ADDroval for the CONV-132000 <br /> Based on the Professional Engineer's review and the documentation you've submitted, <br /> we are granting approval of the CONV-132000 under the following conditions: <br /> 1. This model comes in several sizes in order to accommodate various dimensions <br /> of UDC and dispenser. Schematics of all existing and future sizes for the CONV- <br /> B2000 shall be made available upon request of the State Water Board. <br /> 2. Materials and procedures employed in the construction of the CONV-132000 shall <br /> remain the same as the materials that were indicated in the documents reviewed <br /> by the State Water Board. <br /> 3. Installation procedures in no way supersede local, State, and federal regulations. <br /> Qualified individuals must obey all local laws, regulations, and requirements <br /> when installing the CONV-132000. <br /> 4. The procedures (CONV-82000 Conversion Frame Installation/Inspection Manual <br /> dated August 21, 2012) submitted in the approval process must be followed in <br /> their entirety. Any variations in the installation procedures must be reviewed and <br /> approved by the State Water Board. <br /> 5. Only qualified individuals meeting the requirements of CCR, Title 23, section <br /> 2715(h), including training and certification by the manufacturer(S. Bravo <br /> Systems, Inc.), are allowed to install this product. <br /> 6. Final authority to approve the use of the COV-132000 in a particular jurisdiction <br /> rests with the local regulatory agency. The local agency may require <br /> preapproval, permit, and/or inspection of the installation by either local agency <br /> staff or a registered professional engineer(special inspector) who has education <br /> and experience with underground storage tank system installations. <br />