Laserfiche WebLink
0 0 <br /> Mr. Don Mukai -4 - January 23, 2013 <br /> Kit, State Registered Professional Engineer Approval letter, and the documentation <br /> included in Bravo's request for review letter dated August 12, 2012. A California <br /> registered Professional Engineer has reviewed documentation containing the CONV <br /> Retrofit Plate Kit's specifications and installation procedures and has concluded that the <br /> CONV Retrofit Plate Kit is acceptable for retrofitting the CONV-132000 to accommodate <br /> existing conduit that protrude through concrete on the exterior of the existing UDC (See <br /> Enclosure 3). <br /> Conditions of Approval for the CONV Retrofit Plate Ki <br /> Based on the Professional Engineer's review and the documentation submitted, we are <br /> granting approval of the CONV Retrofit Plate Kit under the following conditions: <br /> 1. All conditions listed above for the CONV-132000 apply and must be met. <br /> 2. Materials and procedures employed in the CONV Retrofit Plate Kit shall be <br /> identical to those indicated in the Installation Manual for a Bravo CONV-Retrofit- <br /> Plate Kit dated September 24, 2012. <br /> 3. This kit comes in several sizes in order to accommodate various dimensions and <br /> layouts of conduit in dispensers. Instructions for all existing and future retrofits of <br /> the CONV Retrofit Plate Kit shall be made available upon request of the State <br /> Water Board. <br /> 4. Only qualified individuals meeting the requirements of CCR, Title 23, section <br /> 2715(h), including training and certification by the manufacturer (S. Bravo <br /> Systems, Inc.), are allowed to install the CONV Retrofit Plate Kit when authorized <br /> by Bravo in an official correspondence signed by a company representative on a <br /> per qualified individual, per site and per application basis. <br /> 5. The qualified individual must use only the Bravo supplied CONV Retrofit Plate Kit <br /> components and materials tailored for that specific installation on a per site and <br /> per application basis. <br /> 6. The qualified individual must follow the Bravo CONV Retrofit Plan: Plan for <br /> Control of the CONV Retrofit Plate dated August 21, 2012 and any written <br /> instructions supplied by Bravo for that specific installation procedure. <br />