My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1501
>
2300 - Underground Storage Tank Program
>
PR0231989
>
COMPLIANCE INFO_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 8:53:41 AM
Creation date
6/23/2020 6:54:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017-2018
RECORD_ID
PR0231989
PE
2361
FACILITY_ID
FA0003976
FACILITY_NAME
VALLEY PACIFIC CHARTER WAY CARDLOCK
STREET_NUMBER
1501
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337016
CURRENT_STATUS
01
SITE_LOCATION
1501 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231989_1501 W CHARTER_2017-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K. Float and Chain Equipment: ❑ Check this box if floats and chains are not present at this site. <br />❑ Check this box if float and chain equipment is installed but only as <br />secondary leak detection. <br />This section must be completed if floats and chains are used to perform leak detection monitoring. <br />Complete the following checklist: <br />® Yes I ❑ No* Were all float and chain equipment properly inspected and tested for correct functionality? <br />® Yes I ❑ No* Were all float and chain equipment certified to be working properly? <br />F In the Section M, below, describe how and when these deficiencies were or will be corrected. <br />L. Impact Valves: <br />❑ Check this box if impact valves are not installed. <br />Complete the following checklist: <br />® Yes ❑ No* Were all impact valves properly inspected and tested for correct functionality? <br />® Yes ❑ No* Were all impact valves certified to be working properly? <br />k In the Section M, below, describe how and when these deficiencies were or will be corrected. <br />M. Comments: <br />1. ALL CHAINS AND FLOATS PASSED. TESTED PER MANUFACTURES GUIDELINES WITH LIQUID. <br />Monitoring System Certification <br />
The URL can be used to link to this page
Your browser does not support the video tag.