My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_1986-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 1:44:53 PM
Creation date
6/23/2020 6:54:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2003
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_1986-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br />Site Address: '0 UC� 7`d r� Date of Testing/Servicing: -LIJKO I -E�O <br />F. In -Tank Gauging / SIR Equipment: O" Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />%—UI ICIC 6UC IVIIV vvauF-, <br />❑ No* <br />a.uc�.auau a. <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Y s <br />13 No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />(Check all that apply) Simulated leak rate: d 3 g.p.h.1; ❑ 0.1 g.p.h.2; ❑ 0.2 g.p.h.Z <br />as accuracy of system product level readings tested? <br />Notes: i. Required for equipment -start up certification and annual certification. <br />as accuracy of system water level readings tested? <br />BMW; <br />Ed Y <br />ere all probes reinstalled properly? <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />s <br />ere all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these aeuciencies were yr will I,C - I v.._�... <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />l.0 IeIC <br />Yes <br />file IVLLU <br />❑ No* <br />N'Iu�,' �:a=ca.n==a a. <br />For equipment start-up or annual equipment c cation, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: d 3 g.p.h.1; ❑ 0.1 g.p.h.2; ❑ 0.2 g.p.h.Z <br />Notes: i. Required for equipment -start up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />Ed Y <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />s <br />❑ No* <br />Was the testing apparatus properly calibrated?. <br />Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ NN <br />. ❑'N!A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ Yes <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />��NIA71 <br />or disconnected? <br />❑ Yes <br />Ovqc* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />NIA <br />malfunctions or fails a test? <br />❑ Yes <br />❑ o* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />N/A <br />Yes <br />❑ No* <br />I Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how ana wnen these uellIZICIA Ca ..VI � V= 11 =1= ..� • w��--• <br />H. Comments: <br />P— 2 of 1 11/15/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.