My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_1986-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 1:44:53 PM
Creation date
6/23/2020 6:54:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2003
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_1986-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.-.,q^s-^ar-'xvs?..r•n-.7Tir:7-- vrT;,-�T,+."y�r'T.�n ,...a- -"�+�•- m.*c.r . ^,'?" —T—w— -17 <br /> STATE OF CALIFORNIAWATER RESOURCES CONTR OARD <br /> FORM `B': NDPGROUNDSTORAGETANKPROWRAM <br /> U <br /> WANK TANK PERMIT APPLICATION INFORMATION <br /> COMPLETE A SEPARATE FORM WITH THE FOLLOWING INFORMATION FOR EACH TANK. <br /> C�iPo N P <br /> MARK ONLY F-] 1 NEW PERMIT 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑7 PERMANENTLY C <br /> ONE ITEM ❑2 INTERIM PERMIT ❑4 AMENDED PERMIT ❑6 TEMPORARY TANK CLOSURE ❑8 TANK REMOVED <br /> FACILITY/SITE NAME WHERE TANK IS INSTALLED: �z6s-6 4 tv v FARM TANK-YES NO / <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-IF UNKNOWN—SO SPE IFY M <br /> A. OWNERS TANK ID# ® ? I B. MANUFACTURED BY: l` <br /> C. YEAR INSTALLED l D. TANK CAPACITY IN GALLONS: �U 6 U <br /> f <br /> II. TANK C NTENTS IF(A.1),IS MARKED,COMPLETE ITEM C.IF(A.1),IS NOT MARKED,COMPLETE ITEM D.",- <br /> A. <br /> .A. 1 MOTOR VEHICLE FUEL ❑ 2 PETROLEUM B. C. ❑ 1 UNLEADED 2 LEADED ❑ 3 DIESEL <br /> ❑3 CHEMICAL PRODUCT F-14 OIL PRODUCT ❑ 4 GASAHOL ❑5 JET FUEL ❑ 6 AVIATION GAS <br /> C ❑5 HAZARDOUS ❑ 80 EMPTY ❑ 95 UNKNOWN ❑2 WASTE ❑ 7 METHANOL ❑ 99 OTHER(DESCRIBE IN ITEM D,BELOW) <br /> D. IF NOT MOTOR VEHICLE FUEL,ENTER NAME OF <br /> HAZARDOUS SUBSTANCE STORED&C.A.S.# C.A.S.#: <br /> z2A <br /> x111. TANK CONSTRUCTION MARK ONE IT M ONLY IN BOX A,B,C,&D <br /> A.TYPE OF 1 DOUBLE WALLED ❑3 SINGLE WALLED WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALLED 4 SECONDARY CONTAINMENT 99 OTHER <br /> i <br /> ❑ 1 STEEL/IRON 2 STAINLESS STEEL [:j 3 FIBERGLASS ❑4 TEELCLADW/FIBERGLASS REINFORCED PLASTIC <br /> B.TANK ❑5 CONCRETE F-16 POLYVINYLCHLORIDE F-] 7 ALUMINUM 8 100%METHANOL COMPATIBLE FRP <br /> tMATERIAL ❑9 BRONZE ❑ 10 GALVANIZED STEEL ❑95 UNKNOWN ❑99 OTHER <br /> C. INTERIOR <br /> ❑ 1 RUBBER LINED 2 ALKYD LINING 3 EPDXY LINING 4 PHENOLIC LINING <br /> LINING ❑5 GLASS LINING ❑6 UNLINED ❑95 UNKNOWN <br /> ❑ IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? YESElNO F-199 OTHER <br /> f D.CORROSION ❑ 1 POLYEfHLENE WRAP ❑2 TAR OR ASPHALT F-13 VINYL WRAP a�f4 FIBERGLASS REINFORCED PLASTIC <br /> iPROTECTION ❑5 CATHODIC PROTECTION ❑91 NONE ❑95 UNKNOWN ❑99 OTHER <br /> IV. PIPING INFORMATION CIRCLE A IF AElpyE GROUND, U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A.SYSTEM TYPE A U,1 SUCTION A (ti)2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B.CONSTRUCTION A 1 SINGLE WALLED A V 2 DOUBLE WALLED A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> A U 1 STEEL/IRON A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC) A �UU� 4 FIBERGLASS PIPE <br /> C.MATERIAL A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL CLAD W/FRP A V 8 100%METHANOL COMPATIBLE FRP <br /> A U 9 GALVANIZED STEEL A U 95 UNKNOWN A U 99 OTHER <br /> LEAK DETECTION SY TEM CIRCLE P FOR PRIMARY,OR S FOR SECONDARY,A PRIMARY LEAK DETECTION SYSTEM MUST BE CIRCLED. <br /> I <br /> I <br /> P S 1 VISUAL CHECK P 2 INVENTORY RECONCILIATION P S 3 VADOSE WELLS S 4 ELECTRONIC MONITOR P S 5 GROUND WATER MONITORING WELLS. <br /> P S 6 PRECISION TESTING P S 7 PRESSURETESTING P S 91 NONE P S 95 UNKNOWN P S 99 OTHER <br /> j VI. INFORMATION ON TANK PERMANENTLY CLOSED IN PLACE <br /> 1. ESTIMATED DATE LA T USED(MO/YR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING IN GALLONS INERT MATERIAL? E]YES ❑ NO <br /> I THIS F04A i H kq BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT. <br /> f <br /> APPLICANT'S NAME(PRINTED&SIGNATURE) DATE <br /> LOCAL AGENCY USE ONLY <br /> f <br /> f COUNTY# JURISDICTION# AGENCY# FACILITY ID# TANK ID# <br /> I E[ z- <br /> CURRENT LOCAL AGENCY FACILITYYIRDA, APPRO ED BYPAE PHONE#WITH AREA CODE <br /> PERMIT NUMBER PERMIT APPROVAL DATE PERMIT EXPIRATION DATE <br /> CHECK# PERMIT AMOUNT SURCHARGE AMT. FEE CODE RECEIPT# BY: <br /> FORM B(3-7-88) THIS FORM MUST BE ACCOMPANI Y A FACILITY/SITE APPLICATION, FORM `A',UNLE8b A RRENT FORM`A' HAS BEEN FILED <br /> DATA PROCESSING COPY �jf. <br />
The URL can be used to link to this page
Your browser does not support the video tag.