Laserfiche WebLink
WRITTEN PROCEDURES , <br />FOR MONITORING <br />DOUBLE C!NTAINMENT UNDERGROUND STORAGE <br />Quik Stop Market #148 <br />205 West Lockeford Street <br />Lodi, California 95240 <br />The gasoline storage and dispensing system at this location consists of two (2) 10,000 gallon and <br />.one (1) 8,000 gallon double-wall fiberglass, dry -interstitial, underground storage tanks serving <br />two (2) double -sided multi -product dispensers (MPDs). Product lines are double-wall fiberglass. <br />A. Annular space of tanks and product lines are monitored continuously by electronic <br />probes. Dispenser pans have float mechanisms that trigger shear valve shut-off. <br />B. The Gilbarco EMC Tank and Line Monitoring System is manufactured by Veeder-Root. <br />Leak conditions trigger visual and audible alarms located on the monitoring system <br />control panel. Turbine shutdown will occur if either power is lost to the control panel or <br />if the turbine sump probe(s) sense leak conditions. <br />C. The monitor control panel is located in the market office. The <br />monitor is placed in testmode daily to check alarm function. Results are recorded on a "Daily Monitoring System <br />Inspection <br />D. Monitoring is the responsibility of Auggie Isiderio, Store Manager, or his designated duty <br />clerk. Maintenance of the monitoring equipment is the responsibility of Quik Stop <br />Markets, Inc. Mike Karvelot, Director of Environmental Affairs, will authorize all <br />repairs. <br />E. If an alarm occurs, the Franchisee will immediately contact the Quik Stop Gasoline <br />Department, which will in turn dispatch a qualified service contractor to the site. The <br />service contractor will determine the cause of alarm and advise Quik Stop of site <br />conditions. If an unauthorized release to secondary containment has occurred, action will <br />be immediately taken to implement the attached Simplified Response Plan. <br />F. The monitoring panel, probes, LLDs are tested/certified annually in August. Preventive <br />maintenance and spill bucket testing is scheduled annually in conjunction with monitor <br />certification. SB -989 testing is conducted tri -annually in December ('03, 106, 109, etc). <br />G. A description of the gasoline system operation and operator's responsibilities are <br />discussed in the Franchise Agreement. Initial training in operation of the tank system and <br />monitoring equipment is conducted "on the job" under the supervision of Quik Stop <br />personnel and the Designated UST Operator. <br />