Laserfiche WebLink
SAN JOAQUIN COUNTY <br />�.•� •.o <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />N. 600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.si-ov.org/ehd <br />9�%FOtR� <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />Inspection Date: <br />_ Y4 <br />Lfl <br />❑ <br />Facility Address: <br />Service Request #: <br />Onsite Service Technician's Name: <br />ICC Service Technician11 staller Exp. Date: <br />JManufacturer Trainin • <br />�'7 �p�4 <br />❑ <br />Leak detector <br />❑ <br />A 1W I / AG yn)ina t.61Wja / N�.1�h1z6 <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />EHD Inspect r:cei <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ <br />❑ electronic Serial #: <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />FT <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />SERVICE T - <br />q1 Spill bucket RVminimum 5 gallon <br />❑ Incon TS -STS <br />j Caldwell System ❑ Other <br />EHD Inspect r:cei <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 21 containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />FT <br />Other: see below <br />C1 <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD Inspect r:cei <br />e y: <br />Title: <br />EHD 23-04 <br />Rev 11/17//08 <br />IS <br />UST SERVICE REQUEST INSPECTION REPORT <br />