Laserfiche WebLink
5. Any changes in information and scope of work must be submitted to EHD for <br />approval prior to commencing work. All new addenda supersede the previous <br />ones. <br />6. Contact Aris Cacapit to arrange the following inspections (a 48 hour notice is <br />required): <br />a. One hour hydrostatic test (or equivalent) on the 91 spill container. <br />b. Verify the spill container has a minimum capacity of 5 gallons. <br />c. The test fluid should cover the top joint, and be no less than 1.5 inches <br />below the top of the 91 spill container, regardless of the spill container's <br />capacity. <br />7. A "Certificate of Compliance for Underground Storage Tank Installation Form C" <br />shall be submitted by the owner or the owners' agent [pursuant to (CCR) 2635(d)] <br />before this repair will be considered complete by the EHD. <br />If you have any further questions, please contact me at (209) 468-3453, fax to (209) 468- <br />3433 or email to acacapit@sjcehd.com. <br />;.�. <br />FAV <br />Aris <br />Aris Cacapit <br />Registered Environmental Health Specialist <br />Page 2 of 2 <br />