My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 1:52:27 PM
Creation date
6/23/2020 6:54:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_2008-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON- a Cap *(Off WORM,ENGINEERING, INC. <br /> P.O.Box 1025 <br /> West Sacramento,CA 95691 <br /> (916)373-1152 <br /> CA Contractors License#617238 A,B,Haz September 14,2009 <br /> Owner 95240 Site Address <br /> Quik Stop Markets, Inc. Quik Stop Market#148 <br /> Attn: Michael Karvelot 205 W. Lockeford Street <br /> 4567 Enterprise Street Lodi, CA 95240 <br /> Fremont,CA 94538 <br /> Scope of Work: <br /> The 89 secondary line failed the Tri-Annual Compliance Test. <br /> Obtain the required permit for this work from the local COPA. Includes permit fee.Saw cut,remove and dispose of the concrete <br /> adjacent to UDC#1/2. Excavate as required to expose the secondary line.All backfill spoils to be stockpiled on site for reuse. The <br /> clamp on the seconary line was broken.We removed broken clamp and replaced with a new one.Pre-test line with inspector present <br /> before backfill. Backfill,using existing backfill material. Install new concrete tank slab to match existing,with#4 rebar as needed. <br /> Perform a post-construction SB989 test. <br /> Provide final test results to CUPA and Owner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.