My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 8:15:16 AM
Creation date
6/23/2020 6:54:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2015
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_2010-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
00 <br />CA) <br />N <br />O <br />N <br />O <br />Attestation No. P 588. Attestation No. P 5882 <br />Kevin Graf �G <br />Michael Holkko "` <br />R7�j CQMY+ANT <br />Walton Engineering Inc. <br />:I Installation Training for EVR Phase I by r <br />)n: 10/2/2010 Exp Date: 10/2/201: <br />'this training course does not create a warranty or guaranty by OPW of yot <br />mance pfnOzzleS,, vaporreWverysystems and EVR PHASEIsystems. This <br />of eliminate the need to strictly adhere to manufacturer instructions and pr <br />maintaining nozzles, vapor recovery systems and EVR PHASE I Systems. A <br />Y systems and EVR PHASE I Systems must be installed and maintained in a <br />instructions and procedures. Attestation applies ONL Y to tested named ind, <br />Attestation No. P 5877 <br />r;^*� Juan Jauregui <br />Walton Engineering Inc. <br />Installation Training for EVII Phase I by C7 <br />n: 10/2/2010 Exp Date: 10/2/2012 <br />itis training course does not create a warranty or guaranty by OPW of your <br />ance of nozzles, vapor recovery systems and EVR PHASE I sygems. This t <br />t eNminate the need to strictly adhere to rnanulacturer instructions and pro, <br />wintaining nozzles, vapor recovery sy tents and EVR PHASEI Systems. All <br />systems and EVR PHASE Systems must be installed and maintained in ac, <br />istructlons and procedures. Attestation appfies OW Y to tested named indiv. <br />Walton Engineering Inc. <br />I Installation Training for EVR Phase I by ( <br />in: 10/2/2010 Exp Date: 10/2/2012 <br />this training course does not create a warranty or guaranty by OPW of your <br />cane or nozzles, vapor recovery s ystenzs and EVR PHASE systems This, <br />)t eliminate the need to stnctly adhere to manufacturer instructions and pro <br />nainfaining nozzles, vapor recovery systems and EVR PHASEI Systems: At <br />systems and FVR PHASE I Systems must be installed and maintained in ac <br />nstruclions and procedures. Attestation applies ONL Y to tested named indh <br />Attestation No. P 588 <br />Jessie Wadkins <br />Walton Engineering Inc. <br />I Installation Training for EVR Phase I by + <br />)n: 10/2/2010 Exp Date: 10/2/201; <br />`this training course does not create a warranty or guaranty by OPW of yo; <br />»ance of nozzles, vapor recovery systems and EVR PHASE I systems This <br />of eliminate the need to strictly adhere to manufacturer instructions and pr <br />maintaining nozzles, vapor recovery systems and EVR PHASE I Systems. A <br />y systems and EVR PHASE I Systems must be installed and maintained in a <br />nstnrcbbns and procedures. Attestation applies ONL Y to tested named ind <br />Attestation No. P 588 <br />"IV• s <br />Michael Raymond <br />Walton Engineering Inc. <br />d Installation Training for EVR Phase I by <br />7n: 10/2/2010 Exp Date: 10/2/201; <br />rthis training course does not create a warranty orguaranty by OPW ofyo, <br />:nano& Of nozzles, vapor recovery systems anal EVR PHASE I systems Thi! <br />V eliminate the need to strictly adhere to manufacturer instructions and p; <br />maintaining nozzles, vapor recovery systems and FVR PHASE I Syslems. , <br />Y systems and EVR PHASE I Systems must be installed and maintained in a <br />nstructions and procedures. Attestation applies Oft Yto tested named ino <br />Curtis Carpenter <br />Walton Engineering Inc. <br />Installation Training for EVR Phase I by <br />n: 2/1/2011 Exp Date: 2/1/2013 <br />has baining mum does not ovate a warranty orguaranty by CPW d'yo <br />Wceafnmztr~s wMrrtmvrrYsyst 4#nd€VRPH4SErsysterm Tho <br />' diming/& the O&V m sbk adtaerr 10 manufXturff Insttrffomand p <br />a/ntamingrtoakn vaQarracoMysysternsandEWPXOFrS)stars. <br />;Y t nv and EYR PX,4.SEI _s) l n s most be instaliedand ma/ntafnedIn ; <br />strmWns and omdurm Attestatrvn alias Oft Yto testa named inc <br />Attestation No. P 587E Attestation No. P 5872 <br />• <br />�' <br />Maur•icio Miranda '�� �°°�°�m Steven Flores <br />Walton Engineering Inc. <br />I installation Training for EVR Phase I by ( <br />)n: 10/2/2010 Exp Date: 10/2/21312 <br />this training course does not create a warranty or guaranty by OPW oryou. <br />'I-- ofnozzles, vapor recovery systems and EVR PHASE I systems. This <br />it eliminate the need to strictly adhere to manufacturer instructions and pro <br />naintarning nozzles vapor recovery systems and EVR PHASEI Systems. A, <br />sy stems and EVR PHASE I Systems must be installed and maintained in a, <br />ns:ructions <br />and <br />pr ocedures. Attestation apfVies ONL Y to tested named indi <br />Walton Engineering Inc. <br />I Installation Training for EVR Phase I by C <br />►n: 10/2/2010 Exp Date: 10/2/2012 <br />this training course does not create a warranty or guaranty by OPW of you <br />Bance of nozzles, vapor recovery systems and EVR PHASE I systems. This <br />X eliminate the need to strictly adhere to manufacturer instructions and pro <br />namtaining nozzles, vapor recovery systems and EVR PHASEI Systems. A, <br />systems and FVR PHASE I Systems must be instaped and maintained in at <br />hstrucbbns and prcredurec. Attestation applies ONL Y to tested named indi <br />Attestation No. P 60 <br />Gerardo Guzman Jr. <br />Walton Engineering Inc <br />I Installation Training for EVR Phase I by <br />In: 2/1/2011 Exp Date: 2/1/201: <br />this training course dAesnof urate a warranty orguaranty byADW d'y <br />�anaeofnuzr vaPaysyslandtyyRPhG43Etsystert�c. 77 <br />)tellawte.fhe need to sOX*adhere In rnanedaaiurer/nsbr ochre ands <br />naibt wingnaaft Irapa'rracotiaysysierrsandEVRPf,WSElSystems. <br />'sysYemsand ElrR PhG45EISystems mtrstbe /ristalkd and ma/ntained m <br />Wacoans andPmCeditm;. Atfesla apples ANLYto u sttd named m <br />
The URL can be used to link to this page
Your browser does not support the video tag.