My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 8:15:16 AM
Creation date
6/23/2020 6:54:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2015
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_2010-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adk <br /> SAN J . IN COUNTY ENVIRONMENTAL HEALTH ARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> I.UNDER DISPE 'SEII CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE F9LLOWING METHOD 490-544 <br /> �' 490-54b <br /> El 1.CONTINUOUS ELECTRONIC MONITORING 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑ 4.NO DISPENSERS ❑99.OTHER(Specify)_ - - - ----------------------- <br /> ----------------------------------------------------- - ---------------------------------------------- <br /> PANEL MANUFACTURER: ago-ss ; MODEL#: 490-56. <br /> ----------------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------- <br /> LEAK SENSOR MANUFACTURER: ago-s� ; MODEL#(S): 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES fflb.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN 11a.YES 1111 b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. El a.YES ["b NO 490-61 <br /> UDC MONITORING STOPS T FLOW OF PRODUCT AT THE DISPENSER. *'a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS Wl.SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> ------------- <br /> IF DOUBLE WALLED: <br /> 490-644 <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑1.LIQUID ❑2.PRESSURE [13.VACUUM <br /> --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490-64b <br /> VII.PERIODIC SYSTEM TESTING <br /> El 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> --LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED_(23 CCR§2644.1) <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------ <br /> SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br /> --- -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. ago-67 <br /> VIII.RECORDKEEPING <br /> The ollowing monitoring/m ' enance records are kept for this facility: <br /> Alarm logs 490-68a IVisual Inspection Records 490-68b ❑Tank integrity testing results 490-68c <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 490-68e <br /> ❑ TG Testing results(and supporting documentation records).490-68f ❑ Corrosion Protection 60-day logs 490-68g <br /> Equipment maintenance and calibration records. 4W68h <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br /> REFE4ENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ,,THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> [ff OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ WRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> OTHER(Specify):M69h,M69i ,Written Procedures&Best Management Practices for Monitoring Double Containment UST Systems" <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the Intemational Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENT; /A DITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> OVERFILL PREVENTION(OR PROTECTION)IS ACCOMPLISHED BY THE FOLLOWING TWO(2)METHODS: <br /> 1. MECHANICAL OVERFILL VALVES INSTALLED IN DROP TUBES,SET TO TRIP AT 95%TANK CAPACITY. <br /> 2. SERVICE PENETRATIONS TO THE PRIMARY CONTAINMENT ARE CONTAINED WITHIN SUMPS,INCLUDING FILL&VAPOR RETURN, <br /> XI:PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME MOTA&RMINDER SANGHERA 490-72 TITLE FRANCHISEES 490-73 <br /> NAME SAMI ALKOUSSA 490-74 TITLE DISTRICT ADVISOR 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the in rmation pr vided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATU / 490-76 DATE: 490-77 <br /> OCTOBER 8,2012 <br /> REMSQ1MQ 1,Ink 0wnerL0DeratQr❑Z,ac a w r/ e. 'v f er <br /> APPLICANT NAME(print): 490-78 APPLICANT TITLE: 490-79 <br /> MIKE KARVELOT,for Quik Stop Markets,Inc. DIRECTOR,ENVIRONMENTAL AFFAIRS <br />
The URL can be used to link to this page
Your browser does not support the video tag.