My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 8:28:42 AM
Creation date
6/23/2020 6:54:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_2016-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rw <br /> DESIGNATED UNDERGROUND STORAGE TANK (UST) OP; <br /> MONTHLY VISUAL INSPECTION CHECKLIST 0 2017 <br /> Facility Name Quik Stop Market#148 Date RbUM"M <br /> Facility Address 205 W. Lockeford Street HEALTH DEPARTMEN <br /> City,State,Zip Lodi,CA 95240 <br /> Designated Operator Carpenter,Curtis <br /> ICC Certification# 8167865-UC Expiration March 20,2015 <br /> Signature L Phone (916)825-7857 <br /> Item MONITORING PANEL / ALARM HISTORY Y N NA <br /> 1 Monitoring system is powered on and in proper operating mode. 0 ❑ ❑ <br /> 2 Monitoring system is NOT currently showing any alarms or warnings. 0 ❑ ❑ <br /> 3 Alarm history report/log for the previous month is available,and has been reviewed by the Designated UST Operator. 0 ❑ ❑ <br /> 3a Is a copy of the alarm history report/log to this form? ❑ ❑ <br /> 4 'Each alarm for the previous month has been responded to appropriately. ❑ ❑ <br /> 5 Sensors located in tank-top containment sumps have NOT alarmed in the past month. ❑ ❑ <br /> 5a List all tank-top sumps where alarms occurred in the past month: <br /> L5 alarmed on 10-28-14. <br /> Note: Sumps where an alarm has occurred in the past month must be inspected unless a qualified service technician responded to,and <br /> properly addressed,the cause of the alarm. Attach documentation verifying appropriate service to this report <br /> ff sump inspection is required,record results in item 6,below. <br /> UST SYSTEM INSPECTION <br /> 6 Tank-top containment sumps are free of water,debris,and hazardous substance. Sensors are located properly. <br /> Note: Visual inspection of sumps is only required in sumps where an alarm has occurred in the past month for which there is no service record. <br /> Y N <br /> Sump Location. 89 Annular ❑ <br /> Sump Location: ❑ ❑ <br /> Sump Location: ❑ ❑ <br /> 7 Spill Containment Structures are free of water,debris"and hazardous substance. <br /> Y N NA Y N NA <br /> Tank 1 - Gasoline 87 E ❑ ❑ Tank 3 - Gasoline 91 0 ❑ ❑ <br /> Tank 2 - Gasoline 89 0 ❑ ❑ <br /> 8 Under-dispenser containment areas are free of water,debris,and hazardous substance. Sensors are located properly. <br /> Y N NA <br /> Dispenser 1/2 E ❑ ❑ <br /> Dispenser 3/4 0 ❑ ❑ <br /> PAPERWORK INSPECTION Date Y N NA <br /> 9 Monitoring system certification has been completed within the past 12 months. 07/08/14 1 ❑ ❑ <br /> 10 Secondary containment tests have been completed within the required timeframe. 10/27/14 ■ ❑ ❑ <br /> 11 Spill containment structure(bucket)testing was completed within the past year. 07/08/14 N ❑ ❑ <br /> 12 Tank tightness testing was completed within the required timeframe. ❑ ❑ 0 <br /> 13 Line tightness testing was completed within the required timeframe. ❑ ❑ E <br /> 14 Other required testing/maintenance was completed within the required timeframe. (List items below) <br /> Test/Maintenance Air Quality Test 06/23/14 ■ ❑ ❑ <br /> Test Maintenance ❑ ❑ ❑ <br /> FACILITY EMPLOYEE TRAINING Y N NA <br /> 15 All facility employees have received the required on-the-job training within the past year. ❑ ❑ <br /> 16 All facility employees hired within the past 30 days have received the required on-the-job training. ❑ ❑ <br /> 02014 w" Page 1 Checklist Pi <br /> E--- <br />
The URL can be used to link to this page
Your browser does not support the video tag.