My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 8:28:42 AM
Creation date
6/23/2020 6:54:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_2016-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Vopc� � gnu a ging, ln�. <br /> Quality petroleum Equipment Solutions For laver Years <br /> FtEcEN <br /> Highest Performance, <br /> DEC 2016 .� m. <br /> Most Requested Mechanical Line Leak Detector Built Today! <br /> -TAL <br /> • Any Fuel* iRTME <br /> - Alcohols, Biodiesel, Aviation, Gasoline, lesel <br /> • Any Pump* <br /> • Electronic Interface Available <br /> • Longest Length Pipeline System* <br /> • Largest Volume Pipeline System* <br /> • Integrated Check Valve / Pressure Relief <br /> • Field Adjustable Leak Threshold <br /> • Now Available! Factory Certifications for Installation <br /> and Annual Testing" <br /> The 99 LD-2000 is the most requested mechanical line leak detector built today. New <br /> engineering and the Vml 2-year warranty (after installation) make the 99 LD-2000 more <br /> attractive to station operators d IJay esstsubject <br /> n ever before. Not�ect to field and line®ariables than evernly is the 99 LD-2000 <br /> 2beforess <br /> expensive to own, it is faster a J <br /> Integrated In-Line Check Valve/ Pressure Relief <br /> A leaking check valve in the turbine,defective submersible pump pressure relief,or a defective <br /> bypass valve will allow the line system to depressurize, resetting the leak detector. Drain- <br /> back into the tank and thermal contraction will cause vapor pockets to form. Vapor pockets <br /> increase the length of time it takes for a leak detector to open to full flow. Pump problems <br /> such as these result in slow flow and technical support calls.The resulting service costs and <br /> customer dissatisfaction all take away from the bottom line - making money. <br /> The 99 LD-2000 Is The Only 2" Mechanical Line Leak Detector <br /> Capable Of Holding Line Pressure After The Pump Is Off, <br /> Even With Pump Component Wear Or Failure. <br /> "See Technical Specifications on last page. <br /> "Contact factory for details <br /> �-; U.S.Patent No.4,966,190 - Designed and Manufactured in U.S.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.