Laserfiche WebLink
M <br />-4- <br />Facility Compliance Specifications <br />Component <br />Test <br />Method <br />Standard or Specification <br />Rotatable Phase I Adaptors <br />Exhibit 4 <br />Minimum, 360 -degree rotation <br />Dust Caps <br />Annually, See Figure 2K. <br />Maximum, 108 pound -inch average static torque <br />Overfill Prevention Device <br />Exhibit 5 <br /><-0.17 CFH at 2.00 inches H2O <br />Drain Valve Assembly <br />Exhibit 5 <br /><-0.17 CFH at 2.00 inches H2O <br />UST, PN Valve, Fittings, <br />TP -201.3 <br />2.00 inches H2O - 5 minutes <br />Adaptors, and Connections <br />Positive Pressure: 3.0 ±0.5 inches H2O <br />Pressure/Vacuum Vent <br />Negative Pressure: 8.0 ±2.0 inches H2O <br />Valve <br />Exhibit 6 <br />Leakrate: <_0.05 CFH at +2.0 inches H2O <br /><-0.21 CFH at -4.0 inches H2O <br />Figure 2B <br />OPW Recommended Maintenance Intervals for System Components <br />Component <br />Maintenance Interval <br />Spill Container And Drain Valve <br />Annually, See Figure 2E and Figure 2F. <br />Rotatable Phase I Adaptors <br />Annually, See Figure 2H and 21. <br />Dust Caps <br />Annually, See Figure 2K. <br />Overfill Prevention Device <br />Annually, See Figure 2L. <br />Pressure/Vacuum Vent Valve <br />Annually, See Figure 2P. <br />Each GDF operator/owner shall keep a maintenance log at the facility. The maintenance log <br />shall identify, in chronological order, the date, maintenance performed, maintenance company <br />name, telephone and name of individual(s) conducting maintenance. An example of a Phase I <br />Maintenance Log is shown in Figure 2R. Alternate forms may be used provided they contain <br />the same minimum parameters identified in Figure 2R. <br />OPW Fueling Components - Phase I Vapor Recovery System - VR -1 02-A <br />